Laserfiche WebLink
E-3 <br />40 <br />07/31/2900 )[ON IS: IS FAX 561 562 7180 CARTER ASSOCIATES INC <br />CARTER ASSOCIA <br />CONSULTING ENGINES <br />INC. <br />1709 :1 N94 ST RPAT <br />V11110 WIMAt, FU11110A 12"0-3412 <br />:sl l-532-4101 <br />S,il-503.71 a 0 (FAX) <br />WX 00, <br />MEMO <br />DATE: July 31, 2000 <br />TO; John Ladner, P.E., CDM <br />FROM. David E. Ludhic, P.S.M. <br />"It TjWi*1N*j <br />Q002/003 <br />MA11VIN E, CARTER PA -M. <br />IWAN F, M '11TI1,12- RE - <br />'to( rK 11. PLUM. MR. <br />:'RANK M. FA CtTRIISE. K%M. <br />IIAVID It. CAMT10r, P.S.M. <br />VE. <br />PATRICK S. WINLXHLH. Ikli. <br />RE Specific Purpose Topographic Survey of the Mulching Facility loa*A at the Indian <br />River County Landfill in part of Section 23, Township 33 South, Range .19 East, Indian <br />_Rim <br />I11T 'po M <br />omplete ethod <br />$.1kqa' C <br />........... <br />M, <br />Time Kinematic — G.P.S. <br />We propose to pP;r0="tW41'Sp6,6fiC, ruivoscaw Me <br />Y�iiitili*g -Real T <br />Survey procaftts. If1his is control an site relative <br />to the Florida State Plane CooTdir'W*A" itiand Datum of 1929, and <br />perform the work conventionally. Pi?66,proposal dated; 'NA"ji.17oWiwwere under the assumption <br />the county would furnish equipment to assist us in aomssiupj#k*,q �p"M.sjnre.hgO•pilp4a.problems with county (mulched and un - <br />mulched). Since then, we have learned this will not be possible <br />insurance and liability. <br />We rc-visited the site on Friday and noticed the areas con material have grown <br />dramatically, as far as we can tell - almost double in si= i <br />The following is our revised breakdown of estimated costs sncludi,4A& I <br />1) Surveyor 11: <br />(a) Mission Planning/Set-up G.P.S. P(09=. 4 hours <br />(b) Onsitc RoconAnspection: 6 hours <br />(c) Projoa Management/Supervision 10 <br />Sub -total; 20 hours @SS5.001hr., "#S. 1,700.00 <br />2) Field Crew Time: <br />(a) EstabliWAtcate horizontal -'Vertical Control, <br />(b) G.P.SJRTK location (2 units — I Ban) <br />- Mulching Facility: <br />Sub4ow: <br />3) Office (Surveyor 11) <br />- Processftvicw G.P.S. D= <br />4) Offict (Drafting) <br />- import to C.A.D.DJCreate TIN <br />J.ACYNftOMXA1.M%Ct)M4&iw=WlugA RV,V-"Oc <br />RECEIVED TIME JU..31. 3.22PM <br />4 hours <br />ffima <br />52 hours (a)$145.00/hr. --$ 7,540-00 <br />16 hours @S95,00/hr, -S 1,360.00 <br />12 how <br />_V&ril gffj1XW <br />