My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-266C
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-266C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:17:44 PM
Creation date
7/16/2024 10:53:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2000
Control Number
2000-266C
Agenda Item Number
10.B.3.
Entity Name
Dodgertown
Los Angeles Dodgers, Inc.
Subject
Development Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C] <br />(a) Reject construction work that does not conform to the Design Build Agreement and the <br />Construction Drawings and, when deemed necessary or advisable, require additional inspection or testing <br />of the construction work; <br />(b) Approve change orders approved by the Design Build Finn; <br />(c) Validate amounts owing to the Design Build Firm based on observations at the site and <br />evaluations of the Design Build Firms' Application for Payment (as more frilly set forth in (f) and (g) below); <br />(d) Conduct inspections to determine the date or dates of Substantial Comple don and Final <br />Completion; <br />(e) Review written warranties and other documents required to be assembled by the Design <br />Build Firm; <br />(f) Review the Design Build Firm's Requisitions and, based on their observations and <br />evaluations thereof, cerifv the amounts due Design Build Firm in accordance with the Draw Schedule, all <br />as set forth in Article VIII hereof, and <br />(b} Receive and review all written wan-anties and related documents required to be assembled <br />by the Design Build Firm upon Substantial Completion, and issue a Requisition for -Final Payment upon the <br />Design Build Firm's compliance with the requirements of the Design Build Agreement and the Construction <br />Drawings, all as set forth in Article VIII hereof. <br />4.4. Const>uedon. The Dodgers shall cause to be performed through the Design Build Firm <br />the following construction services for completion of construction of the Project: <br />t a) Provide for permitung for construction of the Projcct: <br />(b) Provide for all construction supervision, inspection. labor, materials, tools, construction <br />equipment and subcontracted items necessary for the construction and equipping of the Project in <br />accordance with the Design Build Agreement and the Construction Drawings, including handling and <br />txarchousine of materials, supplies and equipment; <br />(c) Maintain or cause to be maintained an adequate inspection system and perform or cause <br />to be performed such inspections and testing as will ensure that constntction of the Project is performed <br />in accordance with the requirements of the Design Build Agreement and the Construction Drawings, <br />recording or causing to be recorded all such inspections so performed and providing a copy thereof to the <br />County Representative, which the County or its Authorized Representatives may review at their reasonable <br />discretion from time to time; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.