My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-266C
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-266C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:17:44 PM
Creation date
7/16/2024 10:53:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2000
Control Number
2000-266C
Agenda Item Number
10.B.3.
Entity Name
Dodgertown
Los Angeles Dodgers, Inc.
Subject
Development Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c�] <br />i <br />i <br />ARTICLE VII <br />CONSTRUCTION COMMENCEMENT AND MONITORING <br />7.1. Cons cdUn- 'omngneement Actual physical commencementofconsttuctionshallnot <br />occur until the Design Build Firm has been selected and has executed the Design Build Agreement to <br />construct the Improvements, and the Design Build Firm has prepared or procured the following: <br />(a) Partial construction drawings and Project specifications which show, to the satisfaction of <br />the County and the Dodgers, that the Project as designed conforms to the Proposal and can be built for <br />the Project. Costs, <br />(b) The permits, approvals and insurance necessary for commencement of construction of the <br />Project or the applicable component thereof, <br />(c) The payment and performance bands as required by Article 12 hereof. <br />7.2. Scheduline. Within fourteen (14) calendar days after physical commencement of <br />con_svucriom the Dodgers shall obtain from the Design Build Firm a summary time scaled network diagram <br />for construction of the Project in accordance with the Construction Schedule. In addition to the foregoing, <br />the Design Bund Firm shall submit to the County and the Dodgers a narrative report once each month with <br />the updated schedule in a form agreed upon by the Dodgers and the County. It shall include a description <br />of the progress during the last month in terms of activities completed or in progress, a description of <br />problern areas, current and anticipated delaying factors and their estimated impact on the cost of <br />performance of other activities and completion dates, and an explanation of corrective action taken or <br />proposed. <br />7.3 Progress Meefinps. During the course of construct ion. weekly progress meetings will <br />be held at the Project site. The Dodgers will coordinate and chair such meeungs. The Design Build Fimm <br />shall prepare minutes of each meeting and shall present at each such meeting: (i) an updated network <br />dia_etarn of the Construction Schedule and Draw Schedule: (ii) information concerning any special problems <br />and remedial actions to be taken; (iii) status of fees, permits, building inspections and violations, if any, and <br />t iv I any other matters requested by the Dodgers to be presented. <br />