ARTICLE X <br />ACCEPTANCE <br />10.1 Substandgli Climpigtion. When the Dodgers consider that the Project is Substantially <br />Complete, they shall notify the County that the Project is ready for a Substantial Completion inspection. <br />Within two (2) business days of receipt of the Dodgers' notice bythe County, the Dodgers, together with. <br />the Design Build Firm will make an inspection to deter -mine whetherthe Project is Substantially Complete, <br />and will compile a list of items needing substantial completion or not in accordance with the Design Build <br />Agreement and the Construction Drawings which are required to be remedied in order to achieve <br />Substantial Completion. The Dodgers shall, before authorizing issuance of Certificate of Substantial <br />Completion. require completion or correction of such items. Failure to include an item can such list does <br />not alter the responsibility of the Dodgers to require that all work be completed in accordance with the <br />Design Build Agreement and the Construction Drawings. When the Dodgers determine that the Project <br />is. Substantially Complete, the Dodgers shall deliver to the County notice of such determination, together <br />with a copy of the certificate of occupancy. The date Substantial Completion is considered to have been <br />achieved is the date the Dodgers authorize the issuance of such Certificate of Substantial Completion. A <br />list of any outstanding Punchlist Items required for Final Completion of the Project shall accompany the <br />Certificate of Substantial Completion. Warranties required by the Design Build Agreement and the <br />Construction Drawings shall commence on the date of Substantial Completion unless otherwise provided <br />in the Certificate of Substantial Completion. <br />10.2 Punchlist Items. Upon Substantial Completion of the Project, the Design Build Firm shall <br />remain responsible for having completed any Punchlist Items that are required for Final Completion of the <br />Project. The Design Build Firm shall have completed all such Punchlist Items within thirty (30) calendar <br />days after Substantial Completion. unless the ordering of material will require more than thirty (30) days <br />or the panics araee otherwise. Within ninety (40) days of Subsinntial Completion. the Design Build Firm <br />shall provide to the County surveys and as built drawings showing the location of all improvements <br />constructed as part of the Project. <br />10.3 Final Completion. Within two (2) business days of the Dodgers` request for final <br />inspection, the Design Build Firm will promptly make an inspection of the Project and, when the Project <br />is found to be completed and in accordance with the Design Build .agreement and the Construction <br />Drawings and the Dodgers have received the final certificate of occupancy from the County Building <br />Department, the Panics shall agree in writing that the Project has achieved Final Completion. <br />10.3 Final Pavmcnt The final Payment shall not become due until the Design Build Firm andior <br />the Dodgers submit to the County (i) an affidavit that all payrolls. bills for materials and equipment, and <br />other irdebtedness connected with the work for which the County might in any way be responsible have <br />been paid or will be paid or otherwise satisfied within thirty (30) calendar days after receipt of final <br />Payment, (ii) consent of the surety (if any) to final Payment, (iii) complete and legally effective releases or <br />waivers ( reasonably satisfactory to the County and meeting Minimum Standards) of all liens arising out of <br />22 <br />