My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-151
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 12:12:16 PM
Creation date
7/18/2024 12:07:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/02/2024
Control Number
2024-151
Agenda Item Number
8.P.
Entity Name
Donadio and Associates Architects, PA, A Spiezle Group Inc. Co.
Subject
Agreement for EOC Phase II for Emergency Operations Center Expansion for (RFQ 2022062)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />ARCHITERCTURAL PROFESSIONAL SERVICES PROPOSAL <br />FOR THE IRC EOC ADDITION <br />Architectural/Engineering Professional Services shall be provided to support the design efforts to <br />provide a new, +/- io,000sf Single -Story Buildings Addition to the existing Emergency Operations <br />Center located on the Indian River County Emergency Operations Campus at 4225 43rd Avenue in <br />Vero Beach, FL. Our Professional Services efforts would encompass the design and development of <br />drawings and specifications, procurement, permitting, and construction administration. <br />Proposed Scope of Professional Services: <br />Architectural/Engineering Professional Services shall consist of Architectural and Limited Interiors <br />Services, along with Structural Engineering; Mechanical, Electrical, Plumbing and Fire Protection <br />Engineering, DAS/BDA System Design Engineering for Performance Specification /Infrastructure; <br />including routing and boxes for AV/IT, Civil Engineering and Cost Estimating Services for Schematic <br />Design update, i00% Design Documents, 50% Construction Documents, & go% Construction <br />Documents. <br />The project is a new a new Single -Story Tilt Wall Buildings Addition and will include the following: <br />• Emergency Operation Center Addition of +/- lo,000sf designed for 20oMPH Wind Loading. <br />• General Office Spaces and Conference Room. <br />• Waiting Room with Reception Area and Public Restroom. <br />• Open Office Area for +/- ii Workstaions. <br />• Mens and Womens Restroom with Locker Room and Showers. <br />• Dining/Multi-Purpose Room with a Warming Kitchen and Storage. <br />• Computer Room and Mechnical Room. <br />• Generator/Condensor Yard with Enclosure. <br />• Additonal On -Site Parking. <br />Preliminary Project Budget: <br />As previously provided and approved by the County, the estimated construction budget per Blue Cord <br />Professional Services, dated 04/17/2024 is approximately $6.475 million. We recommend that <br />county hold an additional 1o% for Furniture, Fixtures and Equipment. This budget does not include <br />environmental impacts as we recommend contracting with your environmental consultant to confirm <br />any potential environmental impacts. <br />Preliminary Project Schedule: <br />The goal of the project is to have Construction Documents completed on or about June of 2025. At <br />this time the county has not determined when they will move forward with construction of the project. <br />The actual timing to commence into the construction phase is contingent upon the County's approval <br />to move the project forward into the Permitting and Bidding Phase. Considering this, we have <br />outlined the following preliminary project schedule. Please note that this schedule is based on the <br />information available to us at present and is subject to adjustments during site plan approval, design, <br />bidding, permitting, and the determination of the start of construction. <br />• Award of Contract to Professional: August 2024 <br />• Site Approval December 2024 <br />• Schematic Design/Planning November 2024 <br />• Design Development March 2025 <br />• Construction Documents/Site Permitting June 2025 <br />• Procurement/Permitting/Award: TBD <br />• Construction TBD <br />
The URL can be used to link to this page
Your browser does not support the video tag.