Laserfiche WebLink
EXHIBIT A <br />ARCHITERCTURAL PROFESSIONAL SERVICES PROPOSAL <br />FOR THE IRC EOC ADDITION <br />Architectural/Engineering Professional Services shall be provided to support the design efforts to <br />provide a new, +/- io,000sf Single -Story Buildings Addition to the existing Emergency Operations <br />Center located on the Indian River County Emergency Operations Campus at 4225 43rd Avenue in <br />Vero Beach, FL. Our Professional Services efforts would encompass the design and development of <br />drawings and specifications, procurement, permitting, and construction administration. <br />Proposed Scope of Professional Services: <br />Architectural/Engineering Professional Services shall consist of Architectural and Limited Interiors <br />Services, along with Structural Engineering; Mechanical, Electrical, Plumbing and Fire Protection <br />Engineering, DAS/BDA System Design Engineering for Performance Specification /Infrastructure; <br />including routing and boxes for AV/IT, Civil Engineering and Cost Estimating Services for Schematic <br />Design update, i00% Design Documents, 50% Construction Documents, & go% Construction <br />Documents. <br />The project is a new a new Single -Story Tilt Wall Buildings Addition and will include the following: <br />• Emergency Operation Center Addition of +/- lo,000sf designed for 20oMPH Wind Loading. <br />• General Office Spaces and Conference Room. <br />• Waiting Room with Reception Area and Public Restroom. <br />• Open Office Area for +/- ii Workstaions. <br />• Mens and Womens Restroom with Locker Room and Showers. <br />• Dining/Multi-Purpose Room with a Warming Kitchen and Storage. <br />• Computer Room and Mechnical Room. <br />• Generator/Condensor Yard with Enclosure. <br />• Additonal On -Site Parking. <br />Preliminary Project Budget: <br />As previously provided and approved by the County, the estimated construction budget per Blue Cord <br />Professional Services, dated 04/17/2024 is approximately $6.475 million. We recommend that <br />county hold an additional 1o% for Furniture, Fixtures and Equipment. This budget does not include <br />environmental impacts as we recommend contracting with your environmental consultant to confirm <br />any potential environmental impacts. <br />Preliminary Project Schedule: <br />The goal of the project is to have Construction Documents completed on or about June of 2025. At <br />this time the county has not determined when they will move forward with construction of the project. <br />The actual timing to commence into the construction phase is contingent upon the County's approval <br />to move the project forward into the Permitting and Bidding Phase. Considering this, we have <br />outlined the following preliminary project schedule. Please note that this schedule is based on the <br />information available to us at present and is subject to adjustments during site plan approval, design, <br />bidding, permitting, and the determination of the start of construction. <br />• Award of Contract to Professional: August 2024 <br />• Site Approval December 2024 <br />• Schematic Design/Planning November 2024 <br />• Design Development March 2025 <br />• Construction Documents/Site Permitting June 2025 <br />• Procurement/Permitting/Award: TBD <br />• Construction TBD <br />