My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-266H
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-266H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:41:42 PM
Creation date
7/18/2024 3:15:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2000
Control Number
2000-266H
Agenda Item Number
10.B.7.
Entity Name
Los Angeles Dodgers, Inc.
Subject
Application for Certification of retained Spring Training Franchise to
Florida Office of Tourism, Trade & Economic Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4N <br />• <br />r <br />4,3, Dodgc IL&niM. The Dodgers have the authority to act as follows: <br />(a) Reject construction work that does not conform to tate Design Build Agreement and <br />the Construction Drawings and, when deemed necessary or advisable, require additional inspection <br />or testing of the construction work; <br />(b) Approve change orders approved by the Design Build Firm; <br />(c) Validate amounts owing to the Design Build Firm based on observations at the site <br />and evaluations of the Design Build Firms' Application For Payment (as more fully set forth in (f) and <br />(g) below); <br />(d) Conduct inspections to determine the date or dates of Substantial Completion and <br />Final Completion; <br />(e) Review written warranties and other documents required to be assembled by the <br />Design Build Firm; <br />(f) Review the Design Build Firm's Requisitions and, based on their observations and <br />evaluations thereof, certify the amounts due Design Build Firm in accordance with the Draw <br />Schedule, all as set forth in Article VIII hereof`, and <br />(g) Receive and review all written warranties and related documents required to be <br />assembled by the Design Build Firm upon Substantial Completion, and issue a Requisition for Final <br />Payment upon the Design Build Firm's compliance with the requirements of the Design Build <br />Agreement and the Construction Drawings, all as set forth in Article VIII hereof. <br />4.4. C gnstructian. The Dodgers shall cause to be performed through the Design Build <br />Firm the following construction services for completion of construction of the Project: <br />(a) Provide for permitting for construction of the Project;. <br />a <br />i (b) Provide for all construction supervision, inspection, labor, materials, tools, <br />construction equipment and subcontracted items necessary for the construction and equipping of the <br />I Project in accordance with the Design Build Agreement and the Constriction Drawings, including <br />handling and warehousing of materials, supplies and equipment; <br />L <br />L Ll <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.