My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-266H
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-266H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:41:42 PM
Creation date
7/18/2024 3:15:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2000
Control Number
2000-266H
Agenda Item Number
10.B.7.
Entity Name
Los Angeles Dodgers, Inc.
Subject
Application for Certification of retained Spring Training Franchise to
Florida Office of Tourism, Trade & Economic Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />r <br />ART[CLE X <br />ACCEPTANCE <br />10.1 SuhstantialContpletion. When the Dodgers consider that the Project is Substantially <br />Complete, they shall notify the County that the Project is ready for a Substantial Completion <br />inspection. Within two (2) business days of receipt of the Dodgers' notice by the County, the <br />Dodgers, together with the Design Build Firm will make an inspection to determine whether the <br />Project is Substantially Complete, and will compile a fist of items needing substantial completion or <br />not in accordance with the Design Build Agreement and the Construction Drawings which are <br />required to be remedied in order to achieve Substantial Completion. The Dodgers shall, before <br />authorizing issuance of a Certificate of Substantial Completion, require completion or correction of <br />such items. Failure to include an item on such list does not alter the responsibility of the Dodgers to <br />require that all work be completed in accordance with the Design Build Agreement and the <br />Construction Drawings. When the Dodgers determine that the Project is Substantially Complete, the <br />Dodgers shall deliver to the County notice of such determination, together with a copy of the <br />certificate of occupancy. The date Substantial Completion is considered to have been achieved is the <br />date the Dodgers authorize the issuance of such Certificate of Substantial Completion. A list of any <br />outstanding Punchlist Items required for Final Completion of the Project shall accompany the <br />Certificate of Substantial Completion. Warranties required by the Design Build Agreement and the <br />Construction Drawings shall commence on the date of Substantial Completion unless otherwise <br />provided in the Certificate of Substantial Completion. <br />i 10.2 Punchlist items. Upon Substantial Completion of the Project, the Design Build Firm <br />` shall remain responsible for having completed any Punchlist Items that are required for Final <br />Completion of the Project. The Design Build Firm shall have completed all such Punchlist Items <br />within thirty (30) calendar days after Substantial Completion, unless the ordering of material will <br />require more than thirty (30) days or the parties agree otherwise. Within ninety (94) days of <br />Substantial Completion, the Design Build Firm shall provide to the County surveys and as built <br />drawings showing the location of all improvements constructed as part of the Project. <br />10.3 Final Com !en tion. Within two (2) business days of the Dodgers' request for final <br />inspection, the Design Build Firn will promptly make an inspection of the Project and, when the <br />Project is found to be completed and in accordance with the Design Build Agreement and the <br />Construction Drawings and the Dodgers have received the final certificate of occupancy from the <br />County Building Department, the Parties shall agree in writing that the Project has achieved Final <br />Completion. <br />10.4 Final P_ _a ___vsuent. The final Payment shall not become due until the Design Build Firm <br />and/or the Dodgers submit to the County (i) in affidavit that all payrolls, bills for materials and <br />equipment, and other indebtedness connected with the work for which the County might in any way <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.