Laserfiche WebLink
tr <br />40 <br />40 <br />1 - EXHIBIT B <br />Los Angeles Dodgers - Fero Reach. Florida <br />Opinion of Probable Baseball Improveinentl C'o9t.9 per <br />deGuardiola Conceptual "Master Plan - July 13, 200[1 <br />Concept No. 2 (Revised) <br />1lf - <br />C'Ah"1 !l'}' <br />— UY, <br />A:if0[.'h'T <br />A Minor League Operations <br />Full Fields - sand bued, iription_ surfaausub-surface dreunagc <br />2 <br />5 400,0011 <br />5 <br />800,000 <br />Half Field - sand bescd, lrnpwn. mike, sub -surface drainage <br />1 <br />S 150,000 <br />S <br />170,000 <br />New Outdoor BattuiE Cages <br />8 <br />S 7,500 <br />5 <br />60.000 <br />Observation Tower : Restrooms <br />i.um <br />Surra <br />wa <br />$ <br />i 50,000 <br />Existing Structure Modifications <br />Lamp <br />Sura <br />11'a <br />$ <br />750.000 <br />General Sitework <br />Luia <br />Sum <br />rola <br />$ <br />735,000 <br />..Subtotal A. <br />S <br />2,645,000 <br />Excludes Lrtnd Acquisition Costs <br />B. Major League Operations <br />Full Fields (Existing) - Itn rovements' Bud et <br />2 <br />S 250,000 <br />$ <br />500,000 <br />Half Field (Existing) - 1m rovements" Bud et <br />1 <br />S 100,000 <br />5 <br />300"000 <br />Covered Boning Structure <br />Lurn <br />Sum <br />n/a <br />$ <br />400,000 <br />General Sacwork <br />Lump <br />Sum <br />nla <br />$ <br />375,000 <br />Subtotal B. <br />S <br />1,375,000 <br />C. Holman Field <br />Replace Plavin Field <br />Lamp <br />Sum <br />tva <br />$ <br />500,000 <br />General Sitcwork <br />Lume <br />Surn <br />Wa <br />5 <br />500,000 <br />W&ming Track I]raina a Improvements <br />LuTnp <br />Surn <br />rata <br />$ <br />100,000 <br />:vlisc Stadium Repairs inc, Press Box Improvements <br />Lum <br />Stun <br />wa <br />$ <br />150,000 <br />UpEade Existing Maintenance Building <br />Lump <br />Sum <br />nia <br />$ <br />100,000 <br />Clubhouse Facili rr.r.ruo,rs 1a.o00st':w 3ioof5Fi <br />Lum <br />Sum <br />nla <br />S <br />2,000,000 <br />Subtotal C <br />S <br />3,350,000 <br />h'ore: F4uipmew Replocemcni inclmrkd in IT & E Contingency <br />1 <br />•'SUBTOTAL <br />5 <br />7,370,000 <br />10% Sola Cosislux I11 o Coatm cnCe <br />S <br />1,474,000 <br />..-f OTAL <br />S <br />8,844,00t1 <br />•" Excludes Land Acquisition Chits <br />