Laserfiche WebLink
5 Description: <br />t <br />Painting of Equalization Splitter Box. <br />Purpose: <br />Paint exterior walls to match adjacent headworks structure. <br />Cost: <br />I <br />$1,035.00 <br />i <br />Time: <br />i <br />10 days (FC) <br />6 Description: <br />Sales tax reconciliation. <br />Purpose: <br />County's purchase of equipment resulted in overall project <br />savings in excess of $250,000 associated with sales tax. Amount <br />reflects revision of equipment. <br />Cost: <br />($17,681.56) <br />Time: <br />0 <br />7 Description: <br />Odor Control monitoring conduit. <br />Purpose: <br />Install additional conduit to monitor pH of odor control <br />equipment. <br />Cost: <br />$1,052.00 <br />Time: <br />5 days (FC) <br />8 Description: <br />Existing plant repairs. <br />Purpose: <br />Credit Owner for remainder of bid form allowance. <br />Cost: <br />($23,728.00) <br />Time: <br />0 <br />9 Description: <br />Grit discharge chute. <br />Purpose: <br />Install additional discharge chute for grit collection at headworks <br />structure. <br />Cost: <br />$1,190.00 <br />Time: <br />0 <br />rWIVAd <br />