Laserfiche WebLink
of <br />f <br />• <br />4D <br />Per Month Costs <br />South Tower Site <br />$ <br />2,140.00 <br />Control Point <br />$ <br />2,200.00 <br />North site <br />$ <br />2,360.00 <br />Fellsmere Site <br />$ <br />1,130.00 <br />Dispatch Equipment <br />$ <br />3,038.50 <br />Hobart Site <br />$ <br />912.00 <br />Monthly Total $ <br />11,780.50 <br />1999 CPI (1.020884) <br />1999 CFI Total $ <br />12,026.52 <br />Excluded Items <br />Batteries for DC Power 'Systems <br />Antennas and Coaxial Lines <br />Tower Labor <br />I..ighteniing and Acts of God <br />Fiber System <br />Tower Lighting <br />Yearly Total $ 141,366.00 <br />1999 CPI Total $ 144,318.24 <br />Monthly Total <br />1999 CPI {1.024884} $ 12,026.52 <br />2000 CPI (1.030686) $ 12,395.57 <br />Yearly Total <br />2000 CPI Total $ 148,746.84 <br />