Laserfiche WebLink
Task 4: Preparation of final survey reportlbase reap — Final topographic route <br />survey/base map preparation at a scale of I" = 40'. Copies of electronic <br />file on 3'/:" diskette and reproducible mylar in digital AutoCAD R14. <br />Final signed and sealed surveyor's report: $7,000.00 <br />Total estimate of cost to complete: $31,860.00 <br />Trusting you find this to be in order, and looking forward to the possibility of working <br />will: you on this project. <br />Sincerely, <br />ASSOCIATES, INC. <br />c S. uccurese, P.S.M. <br />FSCfsw <br />J , FSC N110-575sp doc <br />CASS-1ji19111KIN10 <br />I N t• 11111 <br />