My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-282
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2024 10:49:14 AM
Creation date
7/22/2024 10:48:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/19/2000
Control Number
2000-282
Agenda Item Number
11.H.
Entity Name
Masteller Moler & Reed Inc.
Kimley-Horn and Associates, Inc.
Subject
Sebastian Water Assessment US 1, Main Street to Walmart
Authorization to proceed with Survey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.s <br />• <br />a <br />hir. Stephen Coyle, August 16, 2004, Page 2 <br />Klmley-Horn <br />► __ <br />and Associates, Inc. <br />Our scope of services, schedule, and fee are as follows: <br />SCOPE OF SERVICES <br />Task I: Research and Recovery <br />Site reconnaissance for the recovery of horizontal and vertical control <br />(NGVD 1929) and ties to the State Plane Coordinate System, Florida East <br />Zone (NAD 83190). Establish the right-of-way of US Highway 1 from Main <br />Street to Jackson Street. Establish the right-of-way of the Florida East Coast <br />railroad from CR 512 (Eastbound) to a point 100 feet north of the Sebastian <br />Business Supply. <br />Task 2: Records Research <br />Research at the Indian River County Courthouse, Property Appraisers' Office, <br />Utilities, Engineering, Surveying, and Right -of -Way Departments for <br />applicable records in an effort to establish road and canal right -of --ways, <br />existing easements, horizontal and vertical project control, property lines, and <br />ownership. Obtain copses of the most recent recorded deeds for those parcels <br />lying between the Florida East Coast Railroad and US Highway 1 from CR 512 <br />(Eastbound) north to Jackson Street (± 95 parcels). <br />Task 3: Establish Boundary Lines and Location of Constructed Improvements and <br />Utilities within the Project Limits <br />This task will include the field location of the improvements within the <br />proposed corridors (± I [.0W), Cross-sections will be obtained at 1440' <br />intervals and elevations will be shown at potential conflict areas. Boundary <br />lines for those parcels identified in Task 2 above (:t 95 parcels) will be <br />established. <br />Task d: Preparation of rinal Survey ReportlBase Alap <br />Upon completion of the field data acquisition, field note reduction, and position <br />computations, the final topographic surveyo base map will be prepared at a scale <br />of 1" ; 40', <br />
The URL can be used to link to this page
Your browser does not support the video tag.