Laserfiche WebLink
of <br />material. -II lines the Contractor elects to provide the SWDD's For its 0i%n use shall be <br />separated and stockpiled for the S\\' -DD's approval and acceptance. <br />4.20 The Contractor is required to provide all equipment, manpower and services necessary to <br />market product This includes. <br />A. Coordinating the sale of product to one or more third parties for reuse (mulch. <br />compost, fuel. etc.}. Reuse of product shall be in an approved method by the <br />state. <br />B. Contractor is responsible for loading and transporting product From stockpile area <br />to market Contractor shall utilize landfill scales for determining weight of <br />product. <br />C. Materials accepted by Contractor for processing shall become property of <br />Contractor. <br />4.30 The Contractor shall provide the S%kDD a summary of products marketed by Contractor <br />including quantity, destination, receiving destination contact and reuse method of product. The <br />quantity values must be actual weights and volumes based on material crossing the landfill <br />scale. <br />5.0 SCHEDULING WORK <br />5.10 The Contractor shall perform receiving and processing services on a continuous basis at a <br />mutually agreed upon time between the Contractor and the Contract Administrator, who shall be <br />the Manager of the Solid Waste Disposal District. For purposes of drying Contractor may allow <br />raw material to stockpile in preparation for processing, however, at no time is the stockpiled <br />volume to exceed 3500 tons. Irt the event that there is less than 2,000 tons or 13,333 cubic yards <br />in the unprocessed stockpile, Contractor has the option to remove or not have available, <br />equipment necessary for processing until such time that 3,000 tons or 13,333 cubic yards are in <br />the unprocessed stockpile. or at a time avreed upon between the Contractor and the Contract <br />Administrator. <br />5.20 The Contractor may perform additional remote services or additional work as agreed <br />between SWDD and Contractor and within thirty (30) days written notice by the SWDD to the <br />Contractor. <br />5.30 The Contractor shall keep processing equipment on site and maintain processing <br />operation until all material in the unprocessed stockpile at the time of arrival on site is <br />processed. <br />5.40 Contractor shall market materials in a timely manner. Products designated for marketing <br />shall be removed during -reduction process and the stockpile of processed materials shall not <br />exceed 3500 tons per month. However, all products designated for Contractor marketing shall <br />be removed from process area within thirty (30) days of processing. <br />l8 <br />