My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2024
CBCC
>
Meetings
>
2020's
>
2024
>
06/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 9:34:22 AM
Creation date
8/6/2024 9:26:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 2398 PG: 1635 <br />TABLE OF CONTENTS <br />LIST OF FIGURES.................................................................iii <br />1.0 INTRODUCTION............................................................ 1 <br />2.0 PRE -DREDGING SITE PREPARATION AND DESIGN FEATURES ................ 5 <br />2.1 <br />Site Design............................................................. <br />5 <br />2. 1.1 Containment Basin Capacity and Configuration Requirements ............... <br />5 <br />2.1.2 Containment Basin Design ............................................ <br />9 <br />2.2 <br />Facility Constraction.................................................... <br />9 <br />2.2.1 Clearing and Grubbing ............................................. <br />1t <br />2.2.2 Excavation and Grading ............................................ <br />11 <br />2.3 <br />Additional Design Features .............................................. <br />12 <br />2.3.1 Inlet............................................................. <br />12 <br />2.3.2 Weirs............................................................ <br />13 <br />2.3.3 Ponding Depth and Basin Performance ................................. <br />16 <br />2.3.4 Interior Earthworks ................................................ <br />20 <br />2.3.5 Ramps........................................................... <br />21 <br />2.3.6 Perimeter Ditches .................................................. <br />21 <br />2.3.7 Dike Erosion and Vegetation ......................................... <br />23 <br />2.3.8 Site Security ...................................................... <br />23 <br />2.4 <br />Groundwater Monitoring ............................................... <br />24 <br />2.5 <br />Migratory Bird Protection ............................................... <br />25 <br />2.6 <br />Cultural Resources..................................................... <br />26 <br />3.0 OPERATIONAL CONSIDERATIONS DURING DREDGING ...................... 27 <br />3.1 Placement of Pipelines .................................................. 27 <br />3.2 Inlet Operation........................................................ 28 <br />3.2.1 Monitoring Related to Inlet Operation .................................. 29 <br />3.3 Weir Operation........................................................ 30 <br />3.4 Effluent Monitoring.................................................... 33 <br />3.5 Groundwater Monitoring ............................................... 34 <br />i <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.