My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-301
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 10:53:52 AM
Creation date
8/6/2024 10:49:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
10/03/2000
Control Number
2000-301
Agenda Item Number
11.H.1.
Entity Name
IRC Department of Utility ServicesDixie Heights Water Assessment
Tri-Sure Corp.
Subject
Dixie Heights Water Assessment Project
Bid No. 2062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK DIRECTIVE CHANGE <br />No. (Instructions on reverse side) <br />PROJECT: <br />• DATE OF ISSUANCE: <br />OWNER: <br />(Name, <br />Address) <br />CONTRACTOR: <br />CONTRACT FOR: <br />OWNER's Project No. ______ _ <br />ENGINEElt: <br />ENGINEER's Project No. <br />You arc directed to proceed promptly with the following changc(s): <br />Description: <br />' <br />Purpose of Work Directive Change: <br />Attachments: (list documents supporting change) <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, <br />any claim for a Change Order based thereon will involve one of the following methods of <br />detennining the effect of the changc(s). <br />Method of determining change in <br />Contract Price: <br />D Time and materials <br />D Unit prices <br />D Cost plus fixed fee <br />0 Other ----""-------- <br />Estimated increase (decrease) in Contract' Price: $ ____________ . :. <br />If the chang,: involves an increase, the esti• · <br />mated amount is not io be e:tcecded with- <br />out further authorization. <br />RECOMMENDED: <br />bY -----~--------t:flo"" <br />EJCDC No. l910·1·F (191) Ediuonl <br />Method of determining change in <br />· Contract Time:- <br />□ Contractor's records <br />D Engineer's records <br />0 Other----------- <br />Estimated increase (decrease) in Contract <br />Time: ____ days. lf the change <br />involves an increase, the estimated time is <br />not to be exceeded without further autho- <br />-. rization . <br />AUTHORIZED: <br />bY ------0---,-------
The URL can be used to link to this page
Your browser does not support the video tag.