Laserfiche WebLink
CERTlFlCATE OF SUBSTANTIAL COMPLETION <br />OWNER's Project No ............................. . ENGINEER's Project No ......................... . <br />Project .................................. :'.· ....•.••.•..•••.•.••• <br />ONTRACTOR .......................................................... , ............................................... . <br />,-ontract For ..................... , •...••••..••••••• Contract Date ..................................... . <br />l <br />his Certificate of Subs1antial Completion applies to all Work under the Contract Documents or to the followinc specified <br />pa.ns thereof: <br />ro ........................................................................................................................ . <br />OWNER <br />And To <br />CONTRACTOR <br />[be Work to which this Cenilicate applies has been inspected. by authorized represenmives of OWNER. CONTRACTOR <br />• .and ENGINEER. and that Work is hereby declared 10 be substanlially complete in accordance wilh the Contract Documents <br />on <br />································································ DATE OF SUB ST ANTI AL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all•inclusive, and the fail~c to <br />Include &n Item in it docs not alter the responsibility of CONTRACTOR to complete all the Work in accorda.ncc with the <br />Contract Documenu. The items in the tentuive list shall be completed or corrected by CONTRACTOR within ____ days <br />of the above date of Substantial Comple1ion. <br />l:JCOC No. 1910•8·0 0983 Edilion) <br />f'rcP'Vt'd br lhc: EAt,inccn" Joi,., Contract Oocvmcnu Comm,uu 1nd cndoucd by The AuocU1cd CcncnJ C\lntnc100 of Affl(nn, <br />00800-3 S-