My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-301
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 10:53:52 AM
Creation date
8/6/2024 10:49:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
10/03/2000
Control Number
2000-301
Agenda Item Number
11.H.1.
Entity Name
IRC Department of Utility ServicesDixie Heights Water Assessment
Tri-Sure Corp.
Subject
Dixie Heights Water Assessment Project
Bid No. 2062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />l <br />1.lO <br />1.11 <br />J. <br />4. <br />l\t complet ion of t h e c h a nge, Engineer will <br />determine the cost of s uch work based on the <br />unit prices and quantities used . <br />a. con tractor s h all submit documentation to <br />establish the number of units of each <br />item and any c laims for a change in <br />Con tract Time, <br />Engineer will sign and date a second Change <br />order to establish the change in Contract sum <br />and in contract Time. <br />Owner and Contractor will sign a nd date the <br />second Change order to i ndicate their <br />agreement with t h e terms t h erein. <br />TIME AND Ml\TERII\L/FORCE ACCOUNT CHANGE ORDER/CONSTRUC'l'ION <br />CHANGE AUTHORI ZATION <br />A. Engineer and owner will issue a Work Directive <br />Change directing contractor to Proceed wit h the <br />c hanges on a time-and-material/force account basis. <br />B. At completion of the change, Contractor s h a ll <br />s ubmit itemized accountin g and s upport ing data as <br />provided in the Articl e "D ocum e ntation of Proposals <br />and Claims" of this section. <br />c. Engineer will determine the allowable cost of such <br />work, as provided in Ge n eral Condition s and <br />s uppleme n tary Con dition s. <br />D. Engin eer will sign and date the Ch ange Order to <br />establis h the change i n Con tract Sum and in <br />contract Time . <br />E. Owner and contractor will sign and date the change <br />Order to indicate their agreement therein. <br />CORRELATION WI TH CONTRACTOR'S SUBMITTALS <br />A, Contractor s h all periodic ally revise Schedule of <br />Values and Request for Payment forms to record each <br />change as a separate item of Work, and to record <br />t h e adjusted Contract suin . <br />B. Con tractor sha ll periodically revise the <br />Construction Schedule to reflect each change in <br />Contract Time. <br />1. Revise subschcdules to show changes for other <br />items of work affected by the changes. <br />01153-5
The URL can be used to link to this page
Your browser does not support the video tag.