Laserfiche WebLink
SECTION 01311 <br />CONSTRUCTION SC HEDULES <br />(UGC01 311 .rnT) :aa <br />PART 1 -GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Promptly after award of the Contract, Contractor <br />shall prepare and submit to the Engineer estimated <br />construction progress for the Work, with <br />subschedules of related activities which are <br />1.02 <br />A. <br />essential to its progress. <br />B. Coordinate the work and scheduling with and around <br />other contractors and individual trades performing <br />work on the Project. <br />schedules with each <br />c. Submit revised progress <br />application for payment. <br />D. Progress Schedule shall become part of Contract <br />Documents after approval by Engineer. <br />RELATED REQUIREMENTS <br />In other parts of the Contract Documents: <br />1. General Conditions: <br />a. Articles 2 and 6 -Schedules, Reports, <br />and Records <br />b. Sections 6.1 and 6.2 -Supervision by <br />Contractor <br />c. Article 15 Supervision of Work, <br />Termination, and Delay <br />B. Specified in other sections: <br />1.03 <br />}\. <br />l. <br />2. <br />3. <br />Section 01000: <br />Scctiol\ 01201: <br />Section 01340: <br />FORM OF SCHEDULES <br />Description of work <br />Preconstruction conferenc e <br />Shop Drawings, Product Data, <br />and Samples <br />Prepare schedules in the form of a horizontal bar chart <br />as follows: <br />01311-1