Laserfiche WebLink
7 .5 CONTRACTOR has correlated the resulLs o( all such <br />observations, examinations, investigations, explorations , tests, <br />reports and studies with the terms and conditions of the ConLract <br />Documents. <br />7 .6 CONTRACTOR <br />conflicts, <br />discovered <br />resolution <br />CONTRACTOR. <br />has given ENGINEER written <br />errors or discrepancies <br />in the contract Documents <br />thereof by ENGINEER is <br />Article a .CONTRACT DOCUMENTS . <br />noLice of all <br />that he has <br />and the written <br />acceptable to <br />The Contract Documents which comprise the entire agreemenL between <br />OWNER and CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Performance and other bonds (Sections 00610 and 00620). <br />8.3 Notice of Award and Notice to Proceed. <br />8.4 General Conditions (Section 00700). <br />8.5 Supplementary Conditions (Section 00800). <br />8. 6 Specifications bearing the title "DIXIE <br />HEIGHTS WATER ASSESSMENT PROJECT" as listed <br />in the table of contents hereof. <br />8. 7 Drawings, inclusive with each sheet bearing <br />the following general title: <br />"DIXIE HEIGHTS WATER ASSESSMENT PROJECT" <br />8.8 Addenda numbers 1 to _2_, inclusive. <br />8 .9 CONTRACTOR'S Bid (Section 00310). <br />8.10 Indian River County Water and wastewater <br />Utility Standards . <br />8 .11 ·rhe following, which may be de-livered or issued after <br />the ef(ective date ot Lhe Agreement and are not <br />attached hereto: All wriLten amendments and other <br />documenLs amending, modifying, or supplementing the <br />Contract DocumenLs pursuant LO Paragraphs 3. 4 and 3. 5 <br />of the General CondiLiorm. <br />I,\ h