My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-307
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 11:21:37 AM
Creation date
8/6/2024 11:20:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/10/2000
Control Number
2000-307
Agenda Item Number
11.G.4.
Entity Name
Proctor Construction Company
Subject
Construction Management at Risk Agreement
Area
North County Regional Park
Project Number
9926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-1 <br />40 <br />3.1 Owner's Infomtation The Owner shall provide full information regarding his requirements for the Project. <br />3.2 Qwner's Rellresentative The Owner shall designate a representative who shall be fully acquainted with the Project ar-1 shall <br />define the lines of Owner authority to approve Project Construction Budgets and changes in Project. Ile shall render decisions <br />promptly and furnish information expeditiously. <br />3.3 Architect and Engineer's AvEccurtent The Owner shall retain an Architect -Engineer for design and to prepare Construction <br />documents for the Project. The Architect -Engineer's services, duties and responsibilities are described in the Agreement <br />between the Owner and the Architect -Engineer, a copy of whiclm will be fumished to the Contractor. The Agreement between <br />the Owner and the Architect -Engineer shall not be modified without written notification to the Contractor, and approved by <br />the Board of County Commissioners. <br />3.4 Site Survey and Re�rts The Owner shall provide for the furnishing for the site of the Project all surveys describing the <br />physical characteristics, soil reports, and subsurface investigations, legal limitations, utility locations and a legal description. <br />3.5 Approvals and Easements The Owner shall pay for necessary approvals, easements, assessments and charges required for the <br />construction, use or occupancy of permanent structures or for permanent changes in existing facilities. <br />3.6 Leeal Services The Owner shall famish such legal services as may be necessary for providing the items set forth in Article <br />3.5 and such auditing services as he may require. <br />3.7 Drawings and Specifications The Contractor will be furnished a reproducible set of all copies of Drawings and Specifications <br />No reasonably necessary and ready for printing. <br />3.8 Cost of Surveys and Reports The services, information, surveys and reports required by the above paragraphs shall be <br />famished with reasonable promptness in accordance with the approved schedule at the Owner's expense, and the Contractor <br />shall be entitled to rely upon the accuracy and completeness thereof. <br />3.9 Proiect Fault Defects If the Owner becomes aware of any fault or defect in the Projector non-conformance with the Drawings <br />and Specifications, he shall give prompt written notice thereof to the Contractor and Architect -Engineer. <br />3.10 Eundlnf4 The Owner shall furnish in accordance with the established Schedule, reasonable evidence satisfactory to the <br />Contractor that sufficient funds will be available and committed for the cost of each part of the Project. The Contractor shall <br />not commence any work, unless authorized in writing by the Owner. <br />3.11 Lines of Communication The Owner and Architect -Engineer shall communicate with the subcontractors or suppliers only <br />through the Contractor while such method of communication is effective in maintaining project schedules and quality. <br />3.12 tines of Authority The Owner shall establish and maintain lines of authority for his personnel and shall provide this definition <br />to the Contractor and all other affected parties. <br />3.13 Permitting and Code Inspections The Owner recognizes and coordinates with the Permitting Authority and expects the <br />Contractor to do the same. <br />ARTICLE 4 <br />PERMITTING AND INSPECTION <br />Construction will be inspected for code compliance, compliance with Drawings and Specifications, and quality by inspectors working for <br />the Permitting Authority. The building permitting and code inspection requirements shall be as described in Articles 4.1 through 4.2 <br />hereinafter. <br />4.1 Building Permits The Contractor shall provide the information to the Permitting Authority and obtain approval from the <br />Permitting Authority prior to beginning construction: <br />4.2 Code Ins=tions All projects require detailed code compliance inspections during construction in disciplines determined by <br />the Permitting Authority. These disciplines normally include, but are not necessarily limited to, structural, mechanical, <br />electrical, plumbing and general building. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.