My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-308
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 11:24:48 AM
Creation date
8/6/2024 11:24:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/10/2000
Control Number
2000-308
Agenda Item Number
11.G.5.
Entity Name
St. Johns Water Management District
Subject
Agreement for the Development of the East Indian River County
Stormwater Management Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I In <br />40 <br />®► <br />Contract #SD624AA <br />3-13 Technical Analysis -Existing System — The information provided in Task 2 by the <br />- Consultant and the model developed by ECT will be utilized by DISTRICT in the <br />modeling of the IRFWCD drainage system. Existing conditions and future conditions <br />j (Year 2020) shall be modeled by DISTRICT. The models shall simulate actual existing <br />storage and runoff conditions using the SWMM model. <br />Calibration and verification of the runoff model shall be completed by comparing the <br />flows generated by the model with recorded data from historic storm events, results of <br />previous studies of the basin, results from studies or data from similar watershed in the <br />area, and recorded hydrologic data from the gauging program in progress in Indian River <br />County. <br />Flow rates and water -surface profiles for existing and one future land use scenario shall <br />be obtained using the SWMM model. The future scenario shall include the year 2020 <br />Future Land use map from the comprehensive plan. The modeling will include the <br />following storm events: <br />• 2 -Year, 24 Hour <br />• 5 -Year, 24 Hour <br />• 10 -Year, 24 Hour <br />• 25 -Year, 24 Hour and <br />• 100 -Year, 24 Hour <br />Development of runoff hydrographs for future land use conditions shall estimate <br />attenuation of peak rates of runoff for new development required in accordance with <br />current regulations. <br />The water quality portion of the SWMM model shall include average annual pollutant <br />loadings to the IRL, pollutant loading rates for specific land uses, and pollutant removal <br />efficiencies for typical stormwater treatment systems. <br />DISTRICT modeling shall include a pollutant -loading model for at least the following <br />parameters: <br />• Total nitrogen <br />• Total phosphorus <br />j • Orthophosphorus <br />• Suspended solids <br />• TSS <br />I <br />The model prepared by DISTRICT shall be updated as necessary to calculate average <br />annual pollutant loadings for future land use in the basin. Calculations by DISTRICT <br />shall take into account pollutant removal efficiencies of stormwater treatment facilities <br />for major developments permitted after 1980, which is the effective date of stormwater <br />treatment facilities requirements. Calculated results shall be compared with similar prior <br />studies and existing water quality data for consistency. <br />Page 14 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.