Laserfiche WebLink
Add the following to the applicable section, deleting all references that are contrary: The payment <br />for maintaining the sod in a moist condition for a period of at least two weeks as well as the payment <br />for the water and fertilizer, shall be included in the Contract unit price bid as indicated in the Bid <br />Form of the Proposal. At locations when there are vacant lots, Contractor will sod two rows in from <br />the edge of pavement. <br />The sod shall be certified premium grade by an approved grower's association and shall be of tough texture, <br />having a good root system. It shall contain no weeds or other objectionable vegetation. Sod shall be Bahia. <br />The area to be sodded shall have two rows of Bahia. <br />The soil embedded in the sod shall be good clean earth, free of vermin, fungus, and other diseases. <br />On areas where the sod may slide, due m height and slope, the Engineer may direct that the sod be pegged, <br />with pegs driven through the sod blocks into firm earth, at suitable intervals. <br />Any pieces of sod which, after placing, show an appearance of extreme dryness, shall be removed from the <br />work. <br />The areas on which the sod is to be placed shall contain sufficient moisture, as determined by the Engineer, <br />for optimum results after being placed. The sod shall be kept in a moist condition for the duration of the <br />contract period (and in no case less than two weeks). The moistened condition shall extend at least to the <br />full depth of the rooting zone. <br />Payment for the work specified in this item shall be made under <br />Bid Item Sodding Square Yard <br />BID ITEM - SEED AND MDIrw <br />The work specified in this item shall conform to Section 425-1 ofthe Florida Department ofTmnsportation <br />Standard Specifications for Road and Bridge Construction. (2000 Edition) <br />Item of pwment <br />Payment for the work specified in this item shall be made under: <br />Bid Item Grassing Square Yard <br />SP -11 <br />