My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-310
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 11:36:59 AM
Creation date
8/6/2024 11:35:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/10/2000
Control Number
2000-310
Agenda Item Number
11.G.3.
Entity Name
Sheltra & Sons
Subject
Contract for Paving & Drainage Improvements to Willow St. (130 Ave.)
Phase II Between 85th St. & 89th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following to the applicable section, deleting all references that are contrary: The payment <br />for maintaining the sod in a moist condition for a period of at least two weeks as well as the payment <br />for the water and fertilizer, shall be included in the Contract unit price bid as indicated in the Bid <br />Form of the Proposal. At locations when there are vacant lots, Contractor will sod two rows in from <br />the edge of pavement. <br />The sod shall be certified premium grade by an approved grower's association and shall be of tough texture, <br />having a good root system. It shall contain no weeds or other objectionable vegetation. Sod shall be Bahia. <br />The area to be sodded shall have two rows of Bahia. <br />The soil embedded in the sod shall be good clean earth, free of vermin, fungus, and other diseases. <br />On areas where the sod may slide, due m height and slope, the Engineer may direct that the sod be pegged, <br />with pegs driven through the sod blocks into firm earth, at suitable intervals. <br />Any pieces of sod which, after placing, show an appearance of extreme dryness, shall be removed from the <br />work. <br />The areas on which the sod is to be placed shall contain sufficient moisture, as determined by the Engineer, <br />for optimum results after being placed. The sod shall be kept in a moist condition for the duration of the <br />contract period (and in no case less than two weeks). The moistened condition shall extend at least to the <br />full depth of the rooting zone. <br />Payment for the work specified in this item shall be made under <br />Bid Item Sodding Square Yard <br />BID ITEM - SEED AND MDIrw <br />The work specified in this item shall conform to Section 425-1 ofthe Florida Department ofTmnsportation <br />Standard Specifications for Road and Bridge Construction. (2000 Edition) <br />Item of pwment <br />Payment for the work specified in this item shall be made under: <br />Bid Item Grassing Square Yard <br />SP -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.