Laserfiche WebLink
The following itemized Engineering Services are included: <br />a. S.J.R.W.M.D. Grant exhibits and technical review of application. <br />b. Topographic Survey <br />• Perform and assemble topographic survey data for use in construction plans. <br />C. Schedule and coordinate soil borings at the lake site. <br />Review soils for use as a mining operation. <br />d. Environmental report and permitting <br />• Finalize on site mitigation plan <br />Ref: G.K. Environmental, Inc. — Proposed Draft Mitigation Plan dated <br />January 10, 1999 <br />• Review meetings with permitting agencies, provide technical assistance in <br />addressing requests for additional information. <br />e. Permits <br />• S.J.R.W.M.D. Environmental Resource Permit, (40C-4) <br />• U.S.A.C.O.E. <br />f. Engineering final design and specifications <br />• Prepare plans and specifications for structures, piping, excavation, and swales <br />as required for items listed in Section I. Plans will include an overall drawing <br />(1" = 200 ft) and lake improvement drawings (1" = 50 ft). This also includes <br />environmental consultant for incidental wetland impacts. <br />g. Five (5) review meetings of design and specifications, with County staff. <br />Specifications shall include summary of estimated quantities and soils reports from <br />testing laboratory. One (1) review meeting with SJRWMD staff. <br />• Program meeting to outline survey work and scope as defined. <br />• Preparation and/or review of Grant exhibits prior to submittal to SJRWMD. <br />s 60% drawings and specifications, (survey information and preliminary design) <br />• 90% construction plans and specifications, (permit plans) <br />• 100% construction plans and specifications, (construction plans) <br />County will supply their STANDARD BID documents. <br />h. The following items are specifically excluded from this work order and will be <br />provided on an hourly rate basis as needed by the County. <br />I. Follow through after we submit final plans and specs to the County, i.e. <br />contract bidding, administration and/or inspection service. <br />2. Additional engineering to resolve utility conflicts. <br />JACYttiVNGWROJVRCS1,,nv1% Wlgmth%vovcWo dar.MKC-%'ORKOKtk k NO 9=rASK1 dn- P4 -c t of <br />