My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-318
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 12:29:04 PM
Creation date
8/6/2024 12:28:54 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />ITEMIZED MAN-HOUR ESTIMATE <br />TASK 3, ROSELAND <br />STORMWATER IMPROVEMENTS, PHASE I <br />WORK ORDER NO.8 <br />September 27, 2000 <br />A. <br />SJRWMD Grant <br />Engineer II 16 hrs. x $ 90 = <br />$ 1,440.00 <br />Word Processor 2 hrs. x $ 35 — <br />70.00 <br />$ 1,510.00 <br />B. <br />Topographic Survey of Project Work Areas <br />Surveyor II 8 hrs. x $ 85 = <br />$ 680.00 <br />Surveyor III 8 hrs. x $ 75 = <br />$ 600.00 <br />Crew (3 -man) 64 hrs. x $ 95 = <br />6,080.00 <br />$ 7,360.00 <br />C. <br />Schedule, Coordinate and Evaluate Soil Borings <br />Engineer II 3 hrs. x $ 90 = <br />$ 270.00 <br />D. <br />Environmental Report and Permitting <br />Engineer I 2 hrs. x $125 = <br />$ 250.00 <br />Engineer II 8 hrs. x $ 90 = <br />$ 720.00 <br />G.K. Environmental, Inc. (see proposal = <br />2,500.0 <br />dated 5/11/00) <br />$ 3,470.00 <br />E. <br />Permit Plans, Calculations, Reports and Applications <br />Engineer I 2 hrs. x $125 = <br />$ 250.00 <br />Engineer II 90 hrs. x $ 90 = <br />$ 8,100.00 <br />Cad Technician 56 hrs. x $ 50 = <br />$ 2,800.00 <br />Word Processor 4 hrs. x $ 35 = <br />$140.00 <br />$11,290.00 <br />F. <br />Prepare Construction Plans, Specifications and Summary of Quantities <br />Engineer I 2 hrs. x $125 = <br />$ 250.00 <br />Engineer II 24 hrs. x $ 90 = <br />$ 2,160.00 <br />Engineer III 16 hrs. x $ 65 = <br />$ 1,040.00 <br />Cad Technician 88 hrs. x $ 50 = <br />$ 4,400.00 <br />Word Processor 6 hrs. x $ 35 = <br />$ 210.00 <br />$ 8,060.00 <br />1:�1'\1E:N(�tROl1dRt'Str>rmatr4lgrs+tlrtFao elko�eta+wil XTTTBI'T'A'-itrmitrdStan - Hour =ra,k3- oc Pige 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.