Laserfiche WebLink
40 <br />40 <br />40 <br />\\FILESERVER\PUBLIC\Public Works\BLTolfa\dalaOO\Contr&Agr\Contract-Agr\UnityCnt10-6.doc 10/6/00 <br />7. The COUNTY shall provide all designs and drainage calculations previously <br />developed by COUNTY's design consultant, Carter Associates, Inc., so as to assist <br />UNITY CENTER's design and permitting activities. <br />8. The UNITY CENTER shall provide COUNTY with a certified copy of the <br />drainage calculations and the stormwater permit from St. Johns River Water <br />Management District. This will allow COUNTY future retention usage when the <br />43`d Avenue Project is constructed. <br />9. The COUNTY shall support the UNITY CENTER's request to the Indian River <br />Farms Water Control District for a waiver of the 2" runoff requirement. <br />10. The UNITY CENTER shall be responsible for perpetual maintenance of the pond <br />and associated vegetation, as required by permit, at no cost to the COUNTY, and <br />hereby grants the COUNTY a permanent drainage easement to drain runoff from <br />43`d Avenue and 10' Street into the stormwater retention pond on "The Property", <br />and through the outfall structure to the Indian River Farms Water Control District <br />sublateral Canal B-3. <br />11. The UNITY CENTER shall install all vegetative buffers as required by the Land <br />Development Regulations (LDR) including areas along 43rd Avenue and 101 Street, <br />after the 43`d Avenue Widening and Drainage Improvements Project (#9601) is <br />completed. <br />12. The COUNTY shall install at least 3 trees along the UNITY CENTER frontage on <br />43`d Avenue, as a part of the road project's uniform landscape plan, at no cost to <br />UNITY CENTER. The UNITY CENTER may utilize these trees in satisfying their <br />landscape buffer requirements. These trees are valued at approximately $858.60. <br />13. The UNITY CENTER shall convey 15 feet of right-of-way along 10'h Street to the <br />COUNTY, as well as 10 -foot Temporary Construction Easements along 10'h Street <br />and 43' Avenue, and in the pond area, to facilitate construction of the Project. <br />14. The COUNTY shall pave 10' Street from 42nd Avenue to 43`d Avenue as part of the <br />43' Avenue Improvements Project at no cost to UNITY CENTER. This will provide <br />a paved connection from UNITY CENTER's secondary driveway to 43' Avenue. <br />This work is valued at approximately $12,187.47. <br />3of5 <br />