Laserfiche WebLink
k <br />do <br />40 <br />L 9 <br />N <br />D. Funding Sources (round figures to the nearest dollar) <br />The maximum FEMA share for KMGP/FMA projects is 75%. The other 25% can be made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />HMGP/FMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level — such as CDBG, ARS, HOME) may not be used for the State or Local match. <br />Estimated FEMA Share $110.756.25 75% of Total (maximum of 75%) <br />Non -Federal Share <br />Estimated Local Share $ -0- % of Total (Cash) <br />$ -0- <br />Estimated State Share $36.918.75 _ <br />% of Total (In-kind) <br />25% of Total (Cash) <br />% of Total (In-kind) <br />Other Agency Share $ -0- % of Total <br />(Identify Other Non -Federal Agency N/A ) <br />Total Funding sources from above $147.675 _ 100 Total % (should equal 100°/x) <br />Other Non -FEMA Federal Funds $ N/A (Do not include in total) <br />(Identify Other Federal Agency N/A 1 <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone Number otDays to Complete <br />e.g., Demolition of 6 structures and removal of debrisl4 days <br />Provide adequate window protection for public wind shelter. 7 -days following award of contract <br />Page 7 of 15 <br />