My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337A
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 11:58:02 AM
Creation date
8/13/2024 11:57:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337A
Agenda Item Number
11.B.
Entity Name
State of Florida Department of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofit Projects
Sebastian River High School
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br />do <br />40 <br />L 9 <br />N <br />D. Funding Sources (round figures to the nearest dollar) <br />The maximum FEMA share for KMGP/FMA projects is 75%. The other 25% can be made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />HMGP/FMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level — such as CDBG, ARS, HOME) may not be used for the State or Local match. <br />Estimated FEMA Share $110.756.25 75% of Total (maximum of 75%) <br />Non -Federal Share <br />Estimated Local Share $ -0- % of Total (Cash) <br />$ -0- <br />Estimated State Share $36.918.75 _ <br />% of Total (In-kind) <br />25% of Total (Cash) <br />% of Total (In-kind) <br />Other Agency Share $ -0- % of Total <br />(Identify Other Non -Federal Agency N/A ) <br />Total Funding sources from above $147.675 _ 100 Total % (should equal 100°/x) <br />Other Non -FEMA Federal Funds $ N/A (Do not include in total) <br />(Identify Other Federal Agency N/A 1 <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone Number otDays to Complete <br />e.g., Demolition of 6 structures and removal of debrisl4 days <br />Provide adequate window protection for public wind shelter. 7 -days following award of contract <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.