My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337C
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 12:14:01 PM
Creation date
8/13/2024 12:02:26 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W <br />40 <br />D. Funding Sources (round figures to the nearest dollar) <br />The maximum FEMA share for HMGP/FMA projects is 75%. The other 25% can be made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />HMGP/FMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level — such as CDBG, ARS, HOME) may not be used for the State or Local match. <br />Estimated FEMA Share $2,160 75% of Total (maximum of 75%) <br />Non -Federal Share <br />Estimated Local Share $ -0- % of Total (Cash) <br />$ -0- % of Total (In-kind) <br />1 Estimated State Share $720 25% of Total (Cash) <br />$ % of Total (In-kind) <br />Other Agency Share $ -0- % of Total <br />(identify Other Non -Federal Agency N/A <br />Total Funding sources from above $2,880 _ 100 Total % (should equal 100%) <br />Other Non -FEMA Federal Funds $ N/A (Do not include in total) <br />(Identify Other Federal Agency N/A ) <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone Number ofDays to Complete <br />" _--- - e.g., Demolition of 6 structures and removal of debrisl4 days <br />Provide adequate window protection for public wind shelter. 7 -days following award of contract <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.