My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337D
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 12:14:19 PM
Creation date
8/13/2024 12:04:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337D
Agenda Item Number
11.B.
Entity Name
State of Florida Department of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofit Projects
Vero Beach High School Freshman Learing Center
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />C7] <br />40 <br />Access Ii) /1 202 <br />CRITERIA <br />PREFERRED <br />MARGINAL <br />NON- <br />COMPLIANT <br />6. Wind Design <br />SBC is assumed to be <br />Verification <br />the code used. Building <br />was designed in 1976 <br />and has no obvious wind <br />design flaws. <br />7. Construction Type <br />A clearly defined and <br />f Loadpath <br />continuous loadpathfor <br />Verification <br />single story light steel <br />frame with fully <br />frame <br />reinforced cantilever <br />masonry walls. <br />8. Building Condition <br />The building is in good <br />condition with no <br />apparent signs of <br />deterioration <br />9. Exterior Wall <br />The building's exterior <br />Construction <br />walls are constructed of <br />fully reinforced masonry <br />and have no softspot <br />areas. <br />10. Fenestrations / <br />Unprotected windows <br />Window Protection <br />and doors; doors are <br />metal security type; <br />direct exposure to <br />shelter areas & less than <br />15% window area. <br />11. Roof Construction <br />The building has a flat, <br />/ Roof Slope <br />lightweight roof with <br />engineered mechanical <br />connections to support <br />structures below and a 4' <br />overhang. <br />12. Roof Open Span <br />The building has a roof <br />system with 38' between <br />vertical supports. <br />13. Roof Drainage/ <br />No evidence of ponding <br />Ponding <br />is present on roof <br />
The URL can be used to link to this page
Your browser does not support the video tag.