Laserfiche WebLink
Section I. History of Hazards l Damages in the Area to he Protected <br />A. overvlew of Past Damages <br />Describe all past damages from hazardous events in the project area (include name of storm, If applicable), including <br />direct and Indirect costs. tnclude Presidentially declared disasters as well as events that did not result in Presidential <br />declaration. Attach any supporting documents. Direct costs should include damages to structures and infrastructure <br />in the project area as a result of the hazard. Indirect costs should include the cost to the local government to respond <br />to victims of the hazard in the project area, any Interruption to local businesses, and losses of public services (3 <br />examples are provided for your reference). <br />Date Frequency of Event Damages ($j Indirect costs (describe) <br />9113/99 Hurricane Floyd $950,000 in county damage $69,000 for evacuations and emergency preparations <br />(10 year event) <br />tO 14199 Hurricane Irene $250,000 in county damage -0- <br />(5-year event) <br />Section It. Project Description <br />A. flazards to be Mitigated 1 Level of Protection <br />1. Select the type of hazards Fite proposed project will mitigate: <br />13 Flood 19 Wind d Storm surge ❑ Other (list) <br />2. identify the type of proposed project: <br />* Elevation and retrofitting of residential or non-residential structure <br />* Acquisition and relocation Q Acquisition and demolition <br />* Wind retrofit O Minor drainage project that reduces localised flooding <br />❑ Other (please explain) <br />3. List the total number of persons that will be protected by die proposed project: 5.000 <br />4. Fill in the level of protection and the magnitude of event the proposed project will mitigate. <br />(e.g. 23 structures protected against the l{10 -year (1%) flood) <br />structures protected against the - _ -year Flood. (10.25.50, 100, or 500 year) <br />I� l structures protected against 145 mile per hour (mph) winds <br />5. Engineered projects only (e.g. Drainage Improvements), include (attach to this page) ALL engineering <br />calculations and design plans used to determine the above level or protection. <br />6. Project wilt provide protection against the hazards) above for 50 years (i.e.. what is the useful life of tile <br />project). <br />Page 4 of 15 <br />