Laserfiche WebLink
t! <br />w <br />Section G History of Hazards f Damages In the Area to be Protected <br />A. overview of Past Damages <br />Describe all past damages from hazardous events in the project area (include name of storm, if applicable), including <br />direct and indirect costs. include Presidentially declared disasters as well as events that did not result in a Presidential <br />declaration. Attach any supporting documents. Direct costs should include damages to structures and infrastructure <br />In the project area as a result of the hazard. Indirect costs should include the cost to the local government to respond <br />to victims of the hazard in the project area, any interruption to local businesses, and losses of public services (3 <br />examples are provided for your reference). <br />Date _Freauen of Event Dama_tes {$j 1nd1rect costs (describe) <br />9113!49 hurricane Floyd $950,000 in county damage $69,0oo for evacuations and emergency preparations <br />(10 year event) <br />WWI" Hurricane Irene $254,000 in county damage -0- <br />(5-year event) <br />Section U. Project Description <br />A. hazards to be Mitigated f Level of Protection <br />I. Select the type of hazards the proposed project will mitigate: <br />0 Flood 0 Wind 13 Storm surge 0 Other (list) <br />2. Identify the type of proposed project: <br />❑ Elevation and retrofitting of residential or non-residential stricture <br />Q Acquisition and relocation 0 Acquisition and demolition <br />® Wind retrofit 0 Minor drainage project that reduces localized flooding <br />* Other (please explain) <br />3. List the total number of persons that will be protected by ill proposed project:�5,000 _ <br />4. Dill in the level of protection and the magnitude ofevent the proposed project will mitigate. <br />(e.g. 23, structures protected against the 100 -year (l%) flood) <br />structures protected against the -year Flood (to, 25, 50, 100. ar 500 year) <br />I structures protected against 145 mule per (tour (mph) winds <br />5. Engineered projects orrty (e.g. Drainage Improvements), include (attach to this page) ALL engineering <br />calculations and design plans used to determine the above level of protection. <br />G. project will provide protection against the hazard(s) above for 50 years (i.c., what is the usefrd life of the <br />project), <br />Page 4 of 15 <br />