My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337I
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 10:55:18 AM
Creation date
8/15/2024 10:54:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337I
Agenda Item Number
11.B.
Entity Name
State of Florida Dept. of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofits Projects
Sebastian River Middle
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />0. Funding Sources (round figures to the nearest [Lollar) <br />The maximrtae FEMA share far HAfGP/FMA projects is 75%, 'I'ltc other 25% can be matte up of Slate and local funds as well as in- <br />kind services. Moreover, the FMA 'program requires that the maximum in-kind match be no more than 12.5% of (lie total project costs. <br />HMOP&MA funds may be packaged with other Federal funds, but other federal funds (except for Federal finds which lose their <br />Federal identity at the State level -- such as CDBG, ARS, HOW) may not be used for the State or Local match. <br />Estimated FEMA Share $ 17.576.25 75% of Total (maximum of 75%) <br />Nan -Federal Share <br />Estimated Local Share 0- % of Total (Cash) <br />g _o_ °/o of Total (In-kind) <br />Estimated State Shave $5.858.75 25% of'rotal (Cash) <br />S _0- % of Total (In-kind) <br />Other Agency Share $ 4- _ �%u of Total <br />(ldenlify Other Non -Federal Agency NIA _ <br />Total Funding sources frons above $23,435 100 __Total % (should equal 100%) <br />other Non -FEMA Federal Fends $ NIA (Do not include in total) <br />(Identify other Federal Agency NIA <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone <br />e.g., Demolition of G structures and removal of debnsl4 days <br />Provide adequate window protection for public wind shelter. <br />Number of bays to Collin <br />7 -Jays followhip award of Contract <br />Pacle 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.