Laserfiche WebLink
Section I. History of Hazards 1 Damages in the Area to be Protected <br />A. overview of Past Damages <br />Describe altpast damages from hazardous events In the project area (include name of storm, if applicable), including <br />direct and Indirectcosts. Include Presidentially declared disasters as well as events that did not result in a Presidential <br />declaration. Attach any supporting documents. Direct costs should include damages to structures and infrastructure <br />in the project area as a result of the hazard. Indirect costs should include the cost to the local government to respond <br />to victims of the hazard in the project area, any interruption to local businesses, and lasses of public services (3 <br />examples are provided for your reference). <br />Date FreduencjLr of Event Damar�es M Indirect costs (describe) <br />9113199 Hurricane Floyd $950,000 in county damage $69,000 for evacuations and emergency preparations <br />(10 year event) <br />iW4199 hurricane Irene $250,000 in county damage 0 <br />(5 -year event) <br />Section 11. Project Description <br />A, Hazards to be Mitigated 1 Level of Protection <br />1, Select the type of hazards the proposed project will mitigate: <br />r] Flood 6 Wind n Storm surge 0 Other (list) <br />2. Identify the type of proposed project: <br />U Elevation and retrofitting of residential or non-residential structure <br />❑ Acquisition and relocation t7 Acquisition and demolition <br />Wind retrofit C] Minor drainage project that reduces localized flooding <br />❑ other (please explain) <br />3. List the total number of persons that will be protected by the proposed project.S 000 <br />4. Fill in the level of protection and the magnitude of event the proposed project will mitigate. <br />(e.g. 22 structures protected against the 100 -year (I%) flood) <br />structures protected against the -year Flood (to, 25,50. 100. or 5010 year) <br />I structures protected against 145 mile per hour (mph) winds <br />5. Engineered projects only (e.g. Drainage Improvements), include (attach to this page) ALL engineering <br />calculations and design plans used to determine the above level of protection. <br />6. Project will provide protection against the hazard(s) above for 50 years (i.e., what is the useful life of the <br />project). <br />Fuge 4 of 15 <br />