My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337K
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337K
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 11:01:12 AM
Creation date
8/15/2024 11:00:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337K
Agenda Item Number
11.B.
Entity Name
State of Florida Dept. of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofits Projects
Pelican Island Elementary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />C1 <br />Section I. History of Hazards j Damages in the Area to be Protected <br />A. Overview of Past Damages <br />Describe allpast damages from hazardous events in the project area (include name of storm, if applicable), including <br />direct and indirect casts. Include Presidentially declared disasters as well as events that did not result in a Presidential <br />declaration. Attach any supporting documents. Direct costs should include damages to structures and infrastructure <br />in the project area as a result of the hazard. Indirect casts should include the cost to the local government to respond <br />to victims of the hazard in the project area, any interruption to local businesses, and losses of public services (3 <br />examples are provided for your reference). <br />Date Frequency of Event Damages M Indirect costs (describe) <br />9113199 Hurricane Floyd $950,000 in county damage $69,000 for evacuations and emergency Preparations <br />(10 year event) <br />10114!99 Hurricane Irene $250,000 in county damage -0- <br />(5-year event) <br />Section II. Project Description <br />A. Hazards to be Mitigated 1 Level of Protection <br />1. Select the type of hazards the proposed project will mitigate: <br />o Flood 0 Wind 13 Storm surge ❑ Other (list)_ <br />2. Identify the type ofproposed project: <br />❑ Elevation and retrofitting of residential or non-residential structure <br />C) Acquisition and relocation ❑ Acquisition and demolition <br />® Wind retrofit © Minor drainage project that reduces localized flooding <br />O Other (please explain) _^ <br />3. List the total number of persons that will be protected by the proposed project:_ 5,000 _ <br />4. Fill in the level of protection and the magnitude of event the proposed project will mitigate. <br />(e.g. 23 structures protected against the 100 -year (1%) flood) <br />structures protected against the -year Flood (to, i5, 50, 100, or 50o year) <br />1 structures protected against l45 toile per hour (mph) winds <br />5. Engineered projects only (e.g, Drainage Improvements), include (atlach to this page) ALL engineering <br />calculations and design plans used to determine the above level of protection. <br />6. 'Project will provide protection against the hazards) above for 50 years (i.e., what is the userul life of tire <br />project). <br />Page 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.