Laserfiche WebLink
40 <br />C1 <br />�I "1111iC. City or County Map with Project Site and Photographs <br />0 Attach a copy ofa city or county scale map (large enough to show the entire project area) with the project <br />site and structures marked on the map. <br />0 Attach a USGS 1:24,000 topo map with project site clearly marked on the reap. <br />0 For acquisition or elevation projects, include copy of Parcel Map (Tax Map, Property Identification Map, <br />etc.) showing cacti property to be acquired. 17he map should include the Tax IP numbers for each parcel, if <br />possible. <br />0 Attach photographs (2 copies each) for each project site. 'rite photographs should be representative of Che <br />project area, including any relevant streams„ creeks, rivers, etc. and drainage areas which affect the project site <br />or will be affected by the project. <br />Section IV. Budget/Costs <br />In this section, provide details ofall the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, <br />reasonable cost estimates are essential. Since project administrative costs are calculated on a sliding scale, do trot include them in the <br />budget. Also, do not include contingency costs in the budget. <br />A. Materials <br />Limon Dimension Q_yanlify Cost Cost <br />SEE BELOW <br />B. Labor (Include equipment costs -- please indicate all "soft" or in-kind matches) <br />Jescri tion Hours Rale Cort <br />SEE BELOW <br />C. Fees Paid Include any other costs associated with the project. <br />Descri. tion o <br />f 7ask !fours Rare Cost <br />N/A <br />Total Estimated Project {Cost S G1.G00* <br />*The estimated cost of this project includes all labor and materials based on an estimate provided by a <br />professional and licensed project contractor. Estimates were not detailed with materials and labor, as is <br />customary with projects oTtitts type. <br />Page 6 of 15 <br />