Laserfiche WebLink
Ow <br />4§0 <br />P.E. <br />EXHIBIT "A' <br />P-6 ll <br />I?p <br />Lindsey Lanes <br />Phase 11 <br />jilt Price price_ <br />mount <br />Concrete ads at gate valves <br />EA <br />2 $ <br />0. $ <br />S <br />600.00 <br />300.00 <br />�p �Turrj re �moval at phase 1 <br />EA <br />1 $ <br />500.0 <br />500,00 <br />Construct "rr'�Iu �msr0u�hasa 2 <br />EA— <br />2 $ <br />25.00 $ <br />50.00 <br />Ms —fire hydrant <br />Install RPM's at <br />-n <br />EA <br />$ <br />1.7 $ <br />2,74T <br />—F-6 Ea@ ht 91 f w�-y--7—OF— <br />Finish n --- ­-6-md)-----_T—S <br />— I — <br />1570. <br />1 $ <br />200.00 $ <br />200.00 <br />Reset fire hydrant at lot 27(crao <br />- <br />1 $ <br />300.00 $ <br />300M <br />Complete cross drain at 17PI. ve <br />LS <br />1 <br />366-00 $ <br />300.00 <br />Coni plate sanity sewer otean-outs <br />LS <br />-- 3 F <br />200M $ <br />600.00 <br />—300.00 <br />Ste sin <br />—$jOo.6(57j­ <br />Sto bar <br />LF <br />1-5-0 $ <br />100 $ <br />300.00 <br />st-Tri in <br />BY <br />7177: $ <br />1.3d7$---9,336iO <br />Sod <br />120.00 <br />720.00 <br />Street sign <br />EA <br />4i $ <br />1MOO 1 $400.00 <br />Objectmark <br />LS <br />1,000.00_ r $ <br />1,000.00 <br />As built surve <br />LS <br />1 $ <br />2,000.80 $ <br />2.000-00 <br />Testi nq <br />a Wide - 9 stabilized shoulder <br />SY <br />T—$65,69&00 <br />P.E. <br />EXHIBIT "A' <br />P-6 ll <br />I?p <br />