My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-347
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2024 11:56:51 AM
Creation date
8/16/2024 11:55:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
11/14/2000
Control Number
2000-347
Agenda Item Number
11.A.2.
Entity Name
Summerlin's Seven Seas, Inc.
Subject
Addendum 2 to Agreement for Construction of Ground-Level
Boardwalk and Ditch Crossing
Area
Oslo Riverfront Conservation Area
Project Number
7060
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 - SITE WORK <br />; er"Wu 2A - Clearing and z h-Iting <br />Work Included: <br />a. Trim and grub site at location of ground -level boardwalk and ditch crossing the <br />minimum necessary for the work. <br />2. Specification reference: <br />The work specified in this Section shall confornn to Section 11 tl of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge Construction, <br />latest edition, except as modified herein. <br />Execution: <br />b. Trimming of vegetation from construction area to be overseen by county <br />environmental planner or county conservation land manager. Disturbance to <br />vegetation and roots to be mininium necessary to perform construction. <br />C. Remove from site all debris resulting from demolition and removal operations as <br />it accumulates. <br />d. Backfill holes resulting from clearing operations. <br />C. Hand -grade areas affected by clearing and grubbing and leave level maintaining <br />grades and contours of site. <br />f. Demolished materials shall not be used as backfill in holes or in any other areas <br />within site. Cleared materials shall be disposed of by Contractor at his own <br />expense, <br />g. Provide, erect and maintain barriers, lights and other devices as required to protect <br />general public, workers and adjoining property in accordance with General <br />Conditions. <br />h. Cost of all work under this Section shall be included in the lunnp sum price for <br />clearing and grubbing. <br />1 . Work Included: <br />a. Site grading by hand only <br />b. Backfill by hand only <br />TECHNICAL PROVISIONIS <br />TP -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.