Laserfiche WebLink
rti <br />• <br />40 <br />rough carpentry work <br />3 02 INSTALLATION <br />A Set wood framing accurately to required Innes and levels Provide framing <br />members of sizes and on spacings shown Cut„ join, and tightly fit framing around <br />other work. Do not splice structural members between supports <br />B Use only treated, sound, thoroughly seasoned matenals of longest practical lengths <br />and sizes to minimize joints Use materials free of warp, unless warp can be easely <br />corrected by anchorage and attachment %lake light connections between members <br />C. Anchor and nail framing to comply with NFPA Recommended Nailing Schedule <br />of the Manual for House Framing <br />D Brush apply 2 coats of an acceptable wood preservative to surfaces of preservative <br />treated lumber which are field cut, dressed, or dr-illed. <br />3.43 CLEANING <br />A. Clean up debris and cuttings on a regular periodic basis. <br />B. Perforin cleaning during installation of the work and upon completion of the work <br />Remove froth site all excess materials, debris, tools, and equipment. Repair <br />damage from rough carpentry work <br />Cq U OF S KMON 46100 <br />ROUGH CARPJFIY MV <br />06100-4 <br />