Laserfiche WebLink
+• <br />i <br />4D <br />10% retainage) Reimbursements shall be in the form of check front lite COUNTY, and shall not <br />exceed the amount ofj,56.25 correlating to the estimated total cost of design and construction <br />of the water main $ 2f1.0UO.00 (see Exhibit B), less the Developer's line extension fee of44$ 43.75, <br />based on $11.25 per foot ol'properly frontage ofthc proposed water line <br />N. Tropicana Developer's Cent per Front Developer <br />l]rivc l roma +e 1'ry sxt Frornla *c Ftxna[$1 il.) Cost <br />675 395 $11.25$4,443.75 <br />Release of retainage shall be irtade at the titrie the above referenced [acilitics are dedicated <br />to and accepted by the COUNTY. <br />SC - 2. Amendment: <br />This agreement may be modified only by a written instrument executed by all parties to the agreement. <br />SC - 3. Ass i rthili <br />Either party may assign this Agreement, however, the rights granted herein shall run with the lana and <br />UC not considered the personal property of the DEVELOPER, Therefore, while the DEVELOPER has the <br />right under this Agreement to freely transfe r [lie rights and obligations grantccl by [his Agreement, the <br />assignee shall not have tine right to transfer these rights to another property unless this Agreement is <br />amended in writing by the assignee and the COUNTY to provide otherwise. <br />SC - 4. Authorit <br />Each party hereto represents and warrants to lite other that the execution of this agreement and any <br />other documents required or necessary to tic executed pursuant to the provisions hereof are valid, binding <br />obligations and are cifforccable in accordance with their terms. <br />SC - 5. Bidding and Award_ <br />The Indian River County Departmmnt of Utility Services shall review and approve bid proposals and <br />engineering costs related with the Work described herein. Al least three (3) bid estimates frorn qualified <br />utility contractors must be submitted to the Department of Utility Services for review. Approval ofproject <br />costs will be a condition of the Utility Department's reimburscrncrrt for construction. Furthermore, no <br />work shall coinatcace until the Utility Department provides written approval orthc linal construction cost.. <br />The County may rcxluire rexlesign and / or re -bid it' project costs significantly exceed that contained in <br />Exhibit E. <br />SC - 6. Cannons; <br />Captions, if included, in this Agreement are included for convenience only and are not to be considered <br />in any construction or interpretation of this Agreement or any of its provisions. <br />5C - 7. Construction Plans Technical S ecif icutions :and C.'ontracl lkwuments <br />The DEVELOPEIt agrees to complete <a final set of construction drawings and make submission for a <br />Utilities Construction Permit to the indiari River County Utilities Department and Florida Department of <br />Environmental Protection (FDEsP). Prior lea construction, itll permits roust be approved. <br />SC - H. Definition <br />All pronouns shall be deemed to refer to file masculine, feminine, or neuter, singular or plural, as the <br />identity of the party or parties only rcxluire. <br />i'ape2W6 <br />1k%dor r`, AvP vo1cnR <br />