Laserfiche WebLink
• <br />• <br />SCHEDULE OF WATER AND SEWER RATES, FEES AND CHARGES <br />Fire Protection C s e - per hydrantlycar S170.00 <br />Utility Master Plan Revisions required by requested changes to the Indian <br />River County Comprehensive Plan shall be paid by the Applicant <br />requesting the change. Cost plus overhead <br />FRANCHISE C Ali ES <br />Application Fees <br />Establish Franchise <br />Franchise Name Charge <br />Franchise Territory Charge <br />Cbange of ownersbip: <br />49 ERU's or Fewer <br />50 ERU's or More <br />Rate Hearing: <br />49 ERU's or Fewer <br />50 ERU's or More <br />Public Hearing <br />JSIs m n <br />schedutelmsw <br />5 <br />r <br />Cost plus overhead <br />S 50.00 minimum <br />Cost plus overhead <br />$1,100.00 minimum <br />Cost Plus overhead <br />5115.00 minimum <br />Cost plus overhead <br />S115.00 minimum <br />Cost Plus overhead <br />$115.00 minimum <br />Cost plus overhead <br />S300.00 minimum <br />Cost plus overhead <br />$300.00 minimum <br />Cost plus overhead <br />$575.00 minimum <br />Cost plus overhead <br />S115.00 minimum <br />