Laserfiche WebLink
4W <br />SIRWMD Alternative Water Supplies Construction Cost Sharing Application Fore 2000.2001 <br />EVALUATION FACTOR related to question 4. <br />Is the project in an area identified by the SJRWMD Water Supply Assessment as a priority water resource; <br />caution arema or a delineated ansa`?'Ileis will be determined for you by SJRWMD staff. 0-5 points. Yes. Inside <br />caution area = 5; Yes, Inside delincalvel area a 3; No. Outside caution area andlor defineared area = 0. <br />5- Projected schedule <br />Projected starting date: mo. Jrine yr. 2001 . Completion date: mo. _lanuaa_ yr. - 2002 <br />(Funds received through this program may be used only for projects constructed atter a cost sharing <br />contract has been executed and may not be used to reimburse the cost of existing structures or structures <br />alnWy underconstruction. Cost sharing contracts probably will be executed in April or May 2001). <br />6. Will water from this project directly take the place; of an existing or proposed withdrawal from a higher <br />quality watcrsource?......................_..........................._.............. Yes ko No <br />If yes, identify the source and quantity of higher quality water to be replaced. <br />Floridan aquifer ........... yes 11+ no _ 13.14^ million gallons per e r <br />Surficial aquifer ............. yes , no -million gallonsep r year <br />Surface water .............. yes no W million gallonseg r year <br />If surface; water, state name of water body <br />EVALUATION FACTOR related to question 6. <br />Will water from this project directly and effectively take the place of an existing or proposed higher quality <br />water source? 0-20 points. Based on raler's assessment nj' the G(]ecliveness of the project at saving potable <br />water and apparent relative cost effectiveness. Because of the great variation in types ol'prujects. calculations <br />of'cosi ejjeetiveness for widely dissimilar projects. such as urban reuse and agricidlirral freeze prolec•lion ponds <br />will not be crrm1wred. <br />7. Does the project provide other water resource benefits in addition to water supply, such as improving or <br />protecting ,ground or surface water quality, increasing recharge or conserving water? Yes Ys_ No <br />If yes, then describe benefits`? You may add one page atlachmcnt behind this page if necessary. <br />Mixing R.O. cong4c nttate water with reclaimed water will result in a opt reduction oIF approximately <br />36,000 -GPD less conce:ntratc beintt released to the Indian Ifiver. <br />EVALUATION FACTOR related to question 7. <br />Does the project provide other water resource benefits in addition to water supply,. such as improving or <br />protecting ground or surface water quality, increasing recharge or conserving water? 0-10 points. Based on <br />raler`s assessment q/'rhe extent aml signs frcance rYfadditional benefits. <br />RageA - a <br />'illFi#\1ia5N.7C�l�Y1M'I iILIi Y-G'i.illi}a;7M1'ftiya�.I:W,I'euaa��.iame'MMr.nwrt rl.�i)•A� �Wr indr'�rLasr SWMSIAW aMswswr]I �IIpµN.a,�lar!Ji wi! <br />Ilad_l wr 6s <br />