Laserfiche WebLink
• <br />F-1 <br />rA Kimley-Horn <br />and Associales, Inc. <br />Sanitary Sewer System <br />Lift Station <br />8" PVC Sewer Main <br />8" DIP Sewer Main <br />Manhole (0'- 6p) <br />Manhole (6'. 8') <br />Manhole (8'- 10') <br />5' Manhole <br />Double Service <br />Single Service <br />4" PVC Force Main <br />LS <br />1 <br />$77,438.00 <br />LF <br />4.004 <br />$27.83 <br />LF <br />40 <br />$44.77 <br />EA <br />9 <br />$1.573.00 <br />EA <br />3 <br />$1,845.25 <br />EA <br />4 <br />$2,129-50 <br />EA <br />1 <br />$3,025.00 <br />EA <br />19 <br />$254.10 <br />EA <br />8 <br />$217,80 <br />LF <br />180 <br />$18,76 <br />$77,438 <br />$111,431 <br />$1,791 <br />$14.157 V <br />$5,536 <br />$8,513 <br />$3,025 <br />$4,82B <br />$1,742 <br />53.377 <br />General Notes <br />1. Quantities and unit prices (excluding engineering, surveying and sidewalk) based upon <br />construction PFOPOsal submitted by Calhco. Inc.. and dated May 25, 2000. <br />Sub -Total <br />$231,843 <br />Miscellaneous <br />Sidewalk <br />LS <br />1 <br />$11.800-00 <br />$11,800 <br />Seed & Mulch <br />SF <br />38.600 <br />$0.10 <br />$3.860 <br />Bahia Sod <br />SF <br />85,160 <br />$0,20 <br />$17.032 <br />Pavement Markings <br />LS <br />1 <br />$660.00 <br />$650 <br />Engineering <br />LS <br />1 <br />$3,000.00 <br />$3,000 <br />Surveying <br />LS <br />1 <br />$1,500.00 <br />$1,500 <br />Sub -Total <br />$37.852 <br />Total Construction Cost <br />$820,299 <br />_Rvauired _Bond <br />at 115% <br />IQ41344 <br />General Notes <br />1. Quantities and unit prices (excluding engineering, surveying and sidewalk) based upon <br />construction PFOPOsal submitted by Calhco. Inc.. and dated May 25, 2000. <br />