My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, The Bid security of other Bidders whom Owner believes to have a <br />reasonable chance of receiving the award may be retained by the Owner <br />until the earlier of the seventh day after Ore effective date of the <br />Agreement or the sixty-first day after the Bid opening, whereupon Bid <br />security furnished by such Bidders will be returned. Bid security with <br />bids which are not competitive may be returned before the end of the <br />sixty-day period. <br />7. CONTRACT TIME <br />The number of days within which, or dates by which, the work is to be substantially <br />completed and also complete and ready for final payment (the Contract Time) are set <br />forth in the Bid Farm and the Agreement. <br />S. LIQUIDATED DAMAGES <br />Provisions for liquidated damages, if any, are set forth in the Agreement. <br />9. SUBSTITUTE OR "OR EQUAL" ITEMS <br />The Contract, if awarded, will be on the basis of materials and equipment described in <br />the Drawings or specified in the Specifications without consideration of possible <br />substitute or "or equal' items. Whenever it is indicated in the Drawings or specified in <br />the Specifications that a substitute or "or equal' item of material or equipment may be <br />furnished or used by Contractor if acceptable to Engineer, application for such <br />acceptance will not be considered by Engineer until after the Effective Date of the <br />Agreement The procedure for submission of any such application by Contractor and <br />consideration by Engineer is set forth in Paragraphs 6.7.1, 6.7.2, and 6.7.3 of the General <br />Conditions and may be supplemented in the General Requirements. <br />10. Btu FORM <br />10.1 The Bid Form is included with the Bidding Documents; additional copies <br />may be obtained from Engineer (or the issuing office). <br />10.2 All blanks on the Bid Form must be completed in ink or by typewriter. <br />103 Bids by corporations most be executed in the corporate name by the <br />president or a vice president (or other corporate officer accompanied by <br />evidence of authority to sign) and the corporate seal must be affixed and <br />attested by the secretary or an assistant secretary. The corporate address <br />and state of incorporation must be shown below the signature. <br />00100-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.