My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706.050 <br />deducted from the next payment due CONTRACTOR under the terms of this <br />Contract. <br />SC -14.13. <br />Delete paragraph 14.13. of the General Conditions in Its entirety and Insert the <br />following In its place: <br />14.13. If, on the basis of ENGINEER's observation of the Work -during construction <br />and final inspection, and ENGINEER's review of the final Application for Payment <br />and accompanying documentation - all as required by the Contract Documents, <br />ENGINEER Is satisfied that the Work has been completed and CONTRACTOR's <br />other obligations under the Contract Documents have been fulfilled, ENGINEER will <br />Indicate In writing his recommendation of paymeht and present the Application to <br />OWNER for payment. Thereupon ENGINEER will give written notice to OWNER and <br />CONTRACTOR that the Work Is acceptable subject to the provisions of paragraph <br />14.15. Otherwise, ENGINEER will return the Application to CONTRACTOR, <br />Indicating in writing the reasons for refusing to recommend final payment, in which <br />case CONTRACTOR shall make the necessary corrections and resubmit the <br />Application. If the Application and accompanying documentation are appropriate as <br />to form and substance, OWNER shall, within sixty-five days after receipt thereof <br />pay CONTRACTOR the amount recommended by ENGINEER. <br />SC -14.13.1. <br />Add a new paragraph Immediately after paragraph 14.13 of the General Conditions <br />which Is to read as follows: <br />14.13.1. Final payment will be reduced by the amount of excessive costs of plant <br />Inspection of pipe. Excessive costs are defined as the Inspection costs Incurred by <br />OWNER for that amount of pipe which exceeds 125 percent of the aggregate <br />is length of each type Installed. <br />L ARTICLE 15. SUSPENSION OF WORK AND TERMINATION <br />SC -15.2. <br />LAdd a new paragraph Immediately after paragraph 15.2.4. of the General <br />Conditions which is to read as follows: <br />15.2.5. If CONTRACTOR abandons the Work, or sublets this Contract or any part <br />Lthereof, without the previous written consent of OWNER, or if the Contract or any <br />00800.18 <br />Lf/11N6 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.