Laserfiche WebLink
' WORK DIRECTIVE CHANGE - <br />!� (Instructions on reverse side) No. <br />PROJECT: ' DATE OF ISSUANCE: <br />OWNER: <br />(Name, <br />Address) <br />CONTRACTOR: OWNER's Project No <br />ENGINEER: <br />CONTRACT FOR: ENGINEER's Project No. <br />You are directed to proceed promptly with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachments: (list documents supporting change) <br />If a claim is made that the above change(s) have affected Contract Price or ConuactThne, <br />any claim for a Change Order based thereon will involve one of the following methods of <br />determining the effect of the change(s). <br />Method of determining change in Method of determining change in <br />Contract Price: ' Contract Time:, <br />❑ Time and materials ❑ Contractor's records <br />❑ Unit prices ❑ Engineers records <br />❑ Cost plus fixed fee ❑ Other <br />❑ Other <br />Estimated increase (decrease) in Contract Estimated increase (decrease) in Contract <br />Price: $Time: days. If the change <br />If the change involves an increase. the est -1 involves an increase, the estimated time is <br />mated amount is not to be exceeded it not to be exceeded without further autho- <br />outfurther authorization. rization. <br />RECOMMENDED: AUTHORIZED: <br />by by <br />EICDC No. 1910.9-F COD Edition) <br />n<ou.e er �n. e.Y.••n• b1m eamm� oae mmn eamm�am.�a e�m ... sr o" nn«mm a.—t eamna.n xnme.a•. <br />DDaon-29 <br />