My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS . <br />A. GENERAL INFORMATION <br />This document was developed to provide a uniform format for handling contract changes <br />that affect Contract Price or Contact Time. Changes that have been initiated by a Work <br />Directive Change must be incorporated into a subsequent Change Order if they affect . <br />Price or Time. '� ' <br />Changes that affect Contract Price or Contract Time should be promptly covered by a <br />Change Order. The practice of accumulating change order items to reduce the adminis- <br />trative burden may lead to unnecessary disputes. <br />For supplemental instructions and minor changes not involving a change in the Contract <br />Price or Contract Time, a Field Order may be used. <br />B. COMPLETING THE CHANGE ORDER FORM <br />Engineer initiates the form, including a description of the changes involved and attach- <br />ments based upon documents and proposals submitted by Contractor, or requests from <br />Owner, or both. <br />Once Engineer has completed and signed the form, all copies should be sent toContractor. <br />for approval. After approval by Contractor, all copies should be sent to Owner for <br />approval. Engineer should make distribution of executed copies after approval by Owner. <br />H a change only applies to price or to time, cross out the pan of the tabulation that does <br />not apply. <br />00800-3r1, <br />
The URL can be used to link to this page
Your browser does not support the video tag.