Laserfiche WebLink
0 <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART I — GENERAL. <br />1.01 GENERAL <br />Measurement and payment will be based upon work completed and accepted in <br />accordance with the Contract Documents. No separate payment will be made <br />for excavation, trenching dewatering, backfilling, leakage tests, surveying, <br />density tests, or other incidental items of work not shown in the Agreement. <br />1.02 EQUIPMENT AND MATERIALS IN STORAGE <br />Partial payment for materials and equipment in proper storage at the site of the <br />work or other approved storage site will be made for those items for which the <br />Contractor has submitted paid invoices to the Engineer. The partial payment <br />for stored materials will be 50%oI'Ihe value of materials and equipment. based <br />on receipted bills, furnished but not incorporated in the work, as determined by <br />Engineer. <br />1.03 MEASUREMENT <br />A. Mobilixation: Measurement shall be on a lump sum basis, and shall be limited <br />to the following maximum amounts: <br />ORIGINAL CONTRACT AMOUNT (I MAXIMUM AMOUNT OP <br />FROM MORE THAN TO AND INCLUDING ITEM POR MOBILIZATION <br />0 100,000 3,000 <br />100,000 500,000 15,000 <br />500,000 1,000,000 30,000 <br />1,000,000 2,000,000 60,000 <br />2,000,000 3,000,000 90,000 <br />3,000,000 4,000,000 120,000 <br />4,000,000 5,000,000 125,000 <br />5,000,000 6,000,000 150,000 <br />6,000,000 7,000,000 175,000 <br />7,000,000 10,000,000 200,000 <br />10,000,000 --------- 250,000 <br />Should the lump sum price bid for the item Mobilization exceed the maximum <br />permissible amount for this item, as specified herein, the bid price will be <br />reduced to the maximum permissible amount, and the reduced price will be <br />used in correctly determining the total price for comparison of bids received. <br />01025-1 <br />