My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Bidder will complete and include with the bid the Schedule of Bid Items attached to this <br />Proposal. The quantities shown on the Schedule of Bid Items are approximate quantities <br />to be used for the purpose of comparing bids. The actual quantities may vary. his <br />further understood that the actual amount of the Agreement, and payments thereunder, <br />will be based upon the actual quantities placed into the work. <br />5. Bidder agrees that issuing of award may be delayed for a period of up to ninety (90 <br />calendar days after the scheduled closing time for receiving bids. <br />6. • Bidder agrees that the work will be completed in accordance with the following time <br />frame: <br />(a) Within 40 calendar days from effective date of Notice to Proceed, Contractor <br />shall complete the following tasks: _ <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in thejob. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials to thejob site. <br />7. Notify all utilities and other affected parties prior to initiating <br />conslmction. <br />(b) From 41 calendar days to 170 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their preconstruction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a and b) constitute <br />Substantial Completion. <br />e) From 171 calendar days to 200 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />Clean up project area. <br />Remove all equipment and material from project site. <br />Perform commix close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />00310-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.