My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-380
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 1:25:33 PM
Creation date
8/20/2024 1:19:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/2000
Control Number
2000-380
Agenda Item Number
11.C.2.
Entity Name
Tri Sure Corp.
Subject
Sebastian Water Assessment Project Phase 3A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6708.050 <br />2.7. Before any Work at the site Is started, CONTRACTOR shall deliver to OWNER, <br />With copies to ENGINEER and each additional Insured identified in Article 6 of the <br />Supplementary Conditions, certificates of Insurance (and other evidence requested <br />by OWNER) which CONTRACTOR is required to purchase and maintain In <br />accordance with the requirements of Article 5. <br />ARTICLE 3. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC -3.1. <br />Add a new paragraph immediately after Paragraph 3.1. of the General Conditions <br />which is to read as follows: <br />3.1.1. Each and every provision of law and clause required by law to be Inserted In <br />these Contract Documents shall be deemed to be Inserted herein, and they shall be <br />read and enforced as though It were Included herein, and If through mistake or <br />otherwise, <br />of cher party, Is <br />Contract rted, or If not correctly Inserted, hen upon <br />ct Documents shall forthwith be <br />the app <br />physically amended to make such Insertion. <br />ARTICLE 4. TBOF LANDS; REFERENCE POINTS <br />FACE AND PHYSICAL <br />COAD <br />SC -4.1. <br />Add a new paragraph immediately after paragraph 4.1. of the General Conditions <br />which Is to read as follows: <br />4.1.1, if all lands and rights-of-way are not obtained as herein contemplated before <br />construction begins, CONTRACTOR shall begin the Work upon such land and <br />rights-of-way as OWNER has previously acquired. <br />SC -4.2. <br />Add a new paragraph immediately after para0raPh 4.2.1.1 of the General <br />I Conditions which is to read as follows: <br />L� <br />L <br />00800-4 <br />Y 212IN6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.