s 11-67-60 <br />FACILITIES RELOCATION AGREEMENT <br />(Government Entity) <br />THJS AGREEMENT made and entered into this_ day of October Illi by and between <br />_ Indian River County hereinafter called the Applicant, and FLORIDA POWER & <br />LIGHT COMPANY, a Florida corporation with its principal place of business in bade and Palm Beach Counties, Florida, <br />hereinafter called FPL, <br />WITNESSETH. <br />WHEREAS the Applicant intends to construct the widening and four tannin and eneral im rovements of 58th Ave <br />from 8th St. to South of Oslo Rd. and will require the relocation of certain incompatible and conflicting portions of <br />FPL's Facilities and equipment, and <br />WHEREAS FPL will incur costs in the Relocation of FPL's existing and proposed Facilities which costs would not have <br />occurred but for the Applicant's construction, <br />NOW THEREFORE, in consideration of the mutual promises of the Applicant and FPL and other good and valuable <br />consideration, the Parties agree that FPL shall Rearrange the FPL Facilities and the Applicant shall reimburse FPL for the <br />actual cost of such Relocation as follows: <br />ARTICLE I - DEFINITIONS <br />For the purposes of this Agreement the following terms, whether used in the singular or plural, shall have the meanings set <br />forth below when used with initial capitalization: <br />1.1 Betterment is any increase in service capacity of the Replacement FPL Facilities, not attributable to Contractor's <br />construction, over the service capacity of the FPL Facilities prior to Relocation and any upgrading of a Replacement <br />FPL Facility above FPL's current minimum standard practices, as specified in Article III of this Agreement, that <br />normally would be used on projects financed solely by FPL. Betterment does not include: (a) any increase in service <br />capacity required by federal, state or local law which applies to FPL Facilities as of the date of construction of the <br />Replacement FPL Facilities: (b) any increase in service capacity resulting solely from the replacement of devices or <br />materials which at the time of construction of the Replacement FPL Facility are no longer manufactured, processed, <br />or installed and used by FPL in projects financed entirely by FPL, (c) any upgrading of a Replacement FPL Facility <br />requested by the Applicant. (d) any upgrading of a Replacement FPL Facility required by any agency responsible for <br />regulation of FPL Facilities, (e) any upgrading of the Replacement FPL Facility which is necessitated by the <br />Applicant's construction, if the replacement is the same as that used by FPL on FPL's own projects, or (f) any <br />upgrading that will result in a reduction in the overall project cost. <br />1.2 Conversion is the replacement of existing overhead facilities with underground facilities. <br />1.3 Credit Ratio is the credit given to the Applicant in the form of a percentage derived by dividing the sum of the <br />Betterment and the Non•Reimbursahte Work Credit by the Total cost of the Relocation: <br />Credit Ratio - Dollar Amount of Betterment + Non -Reimbursable Work Credit <br />Total Cost of Relocation - The Land and Land Right Cost <br />14 Date Cost Estimate Received, for purposes of this Agreement, shall be deemed to be the day that the cost estimate <br />was hand -delivered or transmitted try facsimile, or if mailed, five days from the date of postmark. <br />1 5 FPL's Facility ar Facilities shall be, but shall not be limited to, any structure consisting of manholes, conduits, poles. <br />wires, cables, substations, system protection equipment or other appurtenance, and associated equipment, and <br />used by FPL in connection with the transmission andlor distribution of electric power. <br />16 Relocation andlor Relocate includes the terms "rearrange or rearrangement' and is the work performed by FPL under <br />this Agreement and any activity made necessary by Applicant's coonystruclion which conflicts with or affects FPL, its <br />Facilities, or service. Relocations shall include conversion of transmission facilities and shall include, but shall not be <br />limited to, permanent or temporary support, protection, relocation, rearrangement design, redesign, abandonment or <br />reconstruction of the FPL Facilities and all other work required to provide continuity of service to FPL's customers <br />which is a result of a conflict - <br />17 Replacement FPL Fatah is any facility which will be constructed under the terms of this Agreement as a <br />consequence of Relocation of an FPL Facility or portion thereof. <br />1 8 salvage is the credit to the Applicant for the reusable materials recovered or removed by FPL less the Salvage <br />Adjustment Credit <br />page t of 6 Goreuw ental Fac•tt*s Ro. Dcslcon Aprrwnant 0W 24M) <br />