My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-007
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 2:32:02 PM
Creation date
8/26/2024 2:31:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
01/02/2001
Control Number
2001-007
Agenda Item Number
11.G.
Entity Name
Lake Grace of Vero Beach, LLC and or Assignees
Subject
Developer's Agreementfor Kings Hwy, Phase II Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />4D <br />40 <br />RTUbhc WorkslC"apital ProjectslKingsPh2lagr-contractslovcrbyfinal.con <br />3. No later than November 30, 2005, COUNTY shall construct at the COUNTY's sole <br />cost and expense the following intersection and roadway improvements along; Kings <br />Highway and 8'h Street in accordance with the attached Exhibit "C"; a) Kings <br />Highway shall be reconstructed as a fourdanc divided roadway; b) on Kings <br />Highway, southbound left and northbound lett turn lanes shall be constructed for <br />travel onto 8'h Street; and, e) a 12 -foot wide left turn lane, a minimum of 200 feel in <br />length, shall be constructed on westbound 8"h Street west or Kings Highway for <br />access directly into the DEVELOPER's site. West end of turn lane will extend to <br />centerline of DEVELOPER's proposed entrance which is 151 feet oast of the <br />northwest comer of DEVELOPER's property. <br />4. The DEVELOPER shall construct a retention pond on DEVELOPER's property to <br />be sited and designed by DEVELOPER at DEVELOPER's discretion, provided that <br />the capacity of said retention pond small be designed and permitted to accept runoff <br />from Kings Highway in accordance with the provisions set forth in Mosby and <br />Associates, Inc., memorandum dated. April 14, 2000, attached as Exhibit "D" and <br />incorporated by this reference. <br />5. The COUNTY shall provide two-way access to the pond excavation along the <br />southerly portion of DEVELOPER's property onto Kings I lig;hway for the duration <br />of the time that it takes to completely excavate and restore the site. <br />6. If the DEVELOPER has not completed construction of his retention pond by <br />February 28, 2001, the DEVELOPER shall commence construction on a one -acre <br />retention pond and outfall structure to the 81h Street sublateral on the <br />DEVELOPER's site for Kings Highway hway runoff. The one -acre retention pond and <br />01.0111 structure shall be constructed in accordance with the COUNTY's permitted <br />plans attached as Exhibit "E" by no later than April 30, 2001. <br />7. If the DEVELOPER's pond has not been permitted and constructed by April 30, <br />2001, the COUNTY shall construct, at the COUNTY's sole cost and expense, a 24' <br />wide by G' deep temporary ditch on the DEVELOPER's site along the Kings <br />Highway frontage beginning; 100 feet north of DEVELOPER's property's southeast <br />comer as shown on Exhibit "C"; this ditch shall conform to the plan of <br />DEVELOPER (know as Lake Grace) which has been submitted to COUNTY for <br />approval, that is, the ditch shall be constructed within the bank of the pond proposed <br />by DEVELOPER and shall be located a distance of 40' from tate proposed <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.